Changes between Version 1 and Version 2 of Research/GaborLens/Meetings/2022/11/03


Ignore:
Timestamp:
Nov 3, 2022, 5:09:25 PM (2 years ago)
Author:
cbaker4
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/GaborLens/Meetings/2022/11/03

    v1 v2  
    11= Gabor Lens meeting: 3NOV2022; 16:00 BST =
    22
    3 **Present:**   [[BR]]
    4 **Apologies:** [[BR]]
     3**Present:** CB (chair), SE, MC, CW, TD, BB, KL, JP  [[BR]]
     4**Apologies:** RH, EB [[BR]]
    55
    66
    77== Notes ==
     81a. Previous actions:[[BR]]
     91. Swansea press release resulted in local "That's TV" interview by RH [[BR]]
     102. DPP went OK for LhARA. Limited engagement but new literature research avenue suggested. [[BR]]
     113. IAB review seemed to go well for WP3 from CB perspective as presenter. Two immeadiate suggestions: 1. continue researching beyond prototype; 2. Engage with other users.  Hopefully IAB will provide feedback in mid-October. [[BR]]
    812
     132a. ITRF now 1/24th complete. Reporting to WP1 due tomorrow. Discussion on spend details - linear of exisiting staff with discontinuity with new staff, equipment spend, etc. [[BR]]
     142b. Full reporting of effort to be considered as to not under represent effort.  Perhaps 3 or 6 monthly, but this effort needs to be considered. [[BR]]
     152c. Discussed in AOB: clear lines of reporting need to be established, currently 'wiki project group' is suggested, details to be discussed in next WPM meeting to not duplicate effort. [[BR]]
     162d. No current update on award letter timescale. [[BR]]
    917
     183a. No update. [[BR]]
    1019
    11 **DoNM:** [[BR]]
     204a. See 2c. [[BR]]
     214b. Discussion on Gabor lens 1 loading technique & apparatus design.  Seperate meeting required. [[BR]]
     224c. Capture mailing list issues noted. [[BR]]
     234d. In person meeting in Swansea proposed. [[BR]]
     24
     25**DoNM:** 10NOV22[[BR]]
    1226
    1327=== Summary of actions: ===
    14 
     281. **CB** Arrange virtual design meeting. [[BR]]
     292. **CB** Arrange in-person ITRF Capture meeting. [[BR]]
     303. **CB** Report October 2022 progress to WP1. [[BR]]
     314. **KL** Look into mailing list issues.  [[BR]]
    1532
    1633----