    1 = Smart phantom meeting: 21st September 2018; 15:00 BST, 16:00 CET =
     1= Smart phantom meeting 21st September 2018 =
    22
    33== Meeting details ==
     
    1717 * Contribution to non-clinical research programme; discussion: All
    1818  * Smart phantom: concept and discussion: AK/All
    19   * [raw-attachment:Simulations.pdf Simulations]: AK
    2019 * Towards a concept and specification for end station; discussion: All
    2120
    2221== Notes: ==
    2322
    24 '''Present:'''
     23'''Present:''' SG, AK, KL, VB, HT
     24
     25 * Contribution to non-clinical research programme; discussion: All
     26  * Smart phantom: concept and discussion: AK/All
     27   * We '''agreed''' that the instrumented (smart) phantom that can deliver a measurement of LET/dose shot-by-shot was a valuable contribution.  So, we pursue the development of the sci-fi detector interleaved with the sample flasks.
     28   * AK presented the slides.  Points noted:
     29    * Two proton energy ranges to be considered: 130--180 MeV; 60--120MeV.  Proton energy spread ~1.5%.
     30    * Dose rates over flask surface: 0.5, 1, 2, 4 and 6 Gy.  Delivered in spots of dimension 0.3x0.3 cm^2.  Each 'spot' has a fraction of the total dose, so that the dose to the flask adds up to the numbers given above.
     31    * Flask sizes: 3x1.5 cm^2 and 8x5 cm^2.
     32  * SmartPhanton or iPhantom ... we discussed.  Eventually, VB observed that iPhantom sounded too much like EyePhanton.  So, we've adopted SmartPhantom.
     33 * Towards a concept and specification for end station; discussion: All
     34  * Working towards proposal for 'LARA' or a part of LARA on the timescale of Dec/Jan.
     35  * We '''agreed''' to work on a specification/simulation of the endstation since this was a critical piece of the specification for LARA.
     36  * HT would work with SG and be the interface to Impeiral for both the SmartPhanton and the LARA endstation design.