Changes between Version 4 and Version 5 of Research/Instrumentation/Meetings/2019/08-02


Ignore:
Timestamp:
Aug 2, 2019, 2:29:45 PM (5 years ago)
Author:
longkr
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/Instrumentation/Meetings/2019/08-02

    v4 v5  
    3737 * Standing invitation to MP to join SmartPhantom meetings.  Contact with MP can be maintained by email and phone.  Specific meetings can be arranged as required.
    3838
     39=== Summary of actions: ===
     40 * **MP**: will check the beam energy spread, perhaps as a function of energy.
     41 * **MP**: will check the definition of the trigger signal.
     42 * **MP**: will make a sketch of the space available for the water phantom, the SmartPhantom, and its electronics.  The couch will be included in the sketch.
     43 * **MP**: will make a sketch ('technical drawing') of the water phantom.
     44 * **HT**: will circulate and post the water phantom specs.
     45 * **LC**: will consider the positioning mechanism.
     46
    3947----
    4048