SmartPhantom meeting: Wednesday 2nd August 2019, 13:00 BST, 14:00 CEST
Notes:
Present: KL, HTL, AK, LC, MP
- Welcome/introduction: KL
- We introduced ourselves: Liam, design engineer (RAL); HTL, AK, KL physicists (Imperial); Monika, responsible for dosimetry/instrumentation (TUW).
- Status of SmartPhantom preparation: HTL
- Slides. Points noted:
- In preparation for the exposure we may need to plan a CT of the SmartPhantom for the TPS calculation.
- In the measurement plan we need to include:
- An exposure with the SmartPhantom and an ionisation chamber to cross calibrate the energy reconstruction; and
- An exposure with the SmartPhantom and the "Linx camera" to cross calibrate he position reconstruction.
- Slides. Points noted:
- Water phantom and preparation for beam at MedAustron: MP
- The phantom that is being planned for the measurements is the same as that used as the basis for the SmartPhantom design.
- Discussion and next steps
- Ethernet is available in the research room;
- MP: Will check the beam energy spread, perhaps as a function of energy.
- There is a trigger signal in the research room. It seems likely that this is the synchrotron cycle-start signal. MP: agreed to check the definition of the trigger signal.
- The electronics should go to the side of the water phantom, not behind. MP: will make a sketch of the space available for the water phantom, the SmartPhantom, and its electronics. The couch will be included in the sketch.
- We need to develop an installation, commissioning, calibration, and exposure plan. Agreed to work on this together.
- It is permitted to use stainless steel studding in the station supports.
- We agreed to consider the construction of a model to allow an early fit-check.
- What is the minimum distance from the flask that we can put the detector? We have a flask at Imperial and can begin to study this.
- We agreed that MP: would make a sketch ('technical drawing') of the water phantom. HT: will circulate and post the water phantom specs.
- We discussed the requirement to position the SmartPhantom accurately and to maintain its position. LC: will consider the positioning mechanism.
- DONM
- Standing invitation to MP to join SmartPhantom meetings. Contact with MP can be maintained by email and phone. Specific meetings can be arranged as required.
Summary of actions:
- MP: will check the beam energy spread, perhaps as a function of energy.
- MP: will check the definition of the trigger signal.
- MP: will make a sketch of the space available for the water phantom, the SmartPhantom, and its electronics. The couch will be included in the sketch.
- MP: will make a sketch ('technical drawing') of the water phantom.
- HT: will circulate and post the water phantom specs.
- LC: will consider the positioning mechanism.
Meeting details
Teleconference
Phone details:
UK: 08082 380274 Austria: 0800 006612 PIN: 5904750902
Full list of telephone contacts may be found here.
Agenda:
- Welcome/introduction: KL
- Status of SmartPhantom preparation: HTL
- Water phantom and preparation for beam at MedAustron: MP
- Discussion and next steps
- DONM
Last modified
5 years ago
Last modified on Aug 2, 2019, 2:29:45 PM
Attachments (4)
- meeting1.pdf (2.1 MB ) - added by 5 years ago.
- MP-IMG-1.jpg (3.4 MB ) - added by 5 years ago.
- MP-IMG-2.jpg (2.9 MB ) - added by 5 years ago.
- MP-IMG-3.jpg (3.3 MB ) - added by 5 years ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.