    3535 * **KL**: Suggest time for schedule discussion on 30Aug19.
    3636  * **Done.**
     37 * **MP**: will check the beam energy spread, perhaps as a function of energy.
     38 * **MP**: will check the definition of the trigger signal.
     39 * **MP**: will make a sketch of the space available for the water phantom, the SmartPhantom, and its electronics.  The couch will be included in the sketch.
     40 * **MP**: will make a sketch ('technical drawing') of the water phantom.
     41 * **HT**: will circulate and post the water phantom specs.
     42 * **LC**: will consider the positioning mechanism.
     43
    3744
    38452. Baseline schedule and progress against schedule: HTL \\