Version 1 (modified by 5 years ago) ( diff ) | ,
---|
SmartPhantom meeting: Wednesday 24th July 2019, 11:00 BST
Meeting details
Blackett 521 (The Tutorial Room) and teleconference
Phone details:
UK: 08082 380274 Austria: 0800 006612 PIN: 5904750902
Full list of telephone contacts may be found here.
Agenda:
- Notes and actions from last meeting:
- KL: Liaise to develop concept for polishing.
- KL send MuScat paper for reference.
- Done.
- KL: Seek meeting with S.Gruber and/or M.Puchalska to get her input into the design.
- Done.
- LC: Check re technical effort at RAL for assembly/dowling etc.
- Done.
- LC/JB: Finalise specification of interface between clear-fibre connector and optical assembly.
- JB Provide ThorLabs part numbers of remaining optical components to AK.
- Done.
- KL: Suggest time for schedule discussion on 30Aug19.
- Done.
- KL: Liaise to develop concept for polishing.
- Baseline schedule and progress against schedule: HTL
- Mechanical design update: LC
- Control system and SciWire readout update: AK
- Simulation/analysis update: HTL
- Next steps
- DONM
- 13Aug19
- AoB
Attachments (4)
- 190806-SmartPhantom.ppt (1.5 MB ) - added by 5 years ago.
-
smartphantom.pdf
(223.7 KB
) - added by 5 years ago.
schedule
- WaterPhantom.pdf (204.4 KB ) - added by 5 years ago.
- IR1.pdf (403.9 KB ) - added by 5 years ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.