Changes between Initial Version and Version 1 of Research/Instrumentation/Meetings/2019/09-13


Ignore:
Timestamp:
Aug 9, 2019 9:16:53 AM (5 years ago)
Author:
longkr
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/Instrumentation/Meetings/2019/09-13

    v1 v1  
     1= SmartPhantom meeting: Wednesday 24^th^ July 2019, 11:00 BST =
     2
     3== Meeting details ==
     4
     5Blackett 521 (The Tutorial Room) and teleconference
     6
     7Phone details:
     8{{{
     9UK: 08082 380274
     10Austria: 0800 006612
     11
     12PIN: 5904750902
     13
     14}}}
     15
     16Full list of telephone contacts may be found [https://ccap.hep.ph.ic.ac.uk/trac/raw-attachment/wiki/Communication/Z0-Phone-details.pdf here].
     17
     18----
     19
     20== Agenda: ==
     21
     221. Notes and actions from [wiki:Research/Instrumentation/Meetings/2019/07-10 last meeting]:
     23 * **KL**: Liaise to develop concept for polishing. \\
     24  *
     25 * **KL** send MuScat paper for reference.
     26  * **Done.**
     27 * **KL**: Seek meeting with S.Gruber and/or M.Puchalska to get her input into the design.
     28  * **Done.**
     29 * **LC**: Check re technical effort at RAL for assembly/dowling etc.
     30  * **Done.**
     31 * **LC/JB:** Finalise specification of interface between clear-fibre connector and optical assembly. \\
     32  *
     33 * **JB** Provide ThorLabs part numbers of remaining optical components to AK. \\
     34  * **Done.**
     35 * **KL**: Suggest time for schedule discussion on 30Aug19.
     36  * **Done.**
     37 * **MP**: will check the beam energy spread, perhaps as a function of energy.
     38 * **MP**: will check the definition of the trigger signal.
     39 * **MP**: will make a sketch of the space available for the water phantom, the SmartPhantom, and its electronics.  The couch will be included in the sketch.
     40 * **MP**: will make a sketch ('technical drawing') of the water phantom.
     41 * **HT**: will circulate and post the water phantom specs.
     42 * **LC**: will consider the positioning mechanism.
     43
     44
     452. Baseline schedule and progress against schedule: HTL \\
     46 * [raw-attachment:smartphantom.pdf​ Schedule]
     47
     483. Mechanical design update: LC \\
     49 * [raw-attachment:190806-SmartPhantom.ppt​ Slides].
     50
     514. Control system and SciWire readout update: AK \\
     52
     535. Simulation/analysis update: HTL \\
     54
     556. Next steps \\
     56
     577. DONM \\
     58 * 13Aug19
     59
     608. AoB \\
     61
     62----