Changes between Version 1 and Version 2 of Research/Instrumentation/Meetings/2019/09-13


Ignore:
Timestamp:
Aug 9, 2019 10:03:43 AM (5 years ago)
Author:
longkr
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/Instrumentation/Meetings/2019/09-13

    v1 v2  
    1 = SmartPhantom meeting: Wednesday 24^th^ July 2019, 11:00 BST =
     1= SmartPhantom meeting: Wednesday 14^th^ August 2019, 11:00 BST =
    22
    33== Meeting details ==
     
    2020== Agenda: ==
    2121
    22 1. Notes and actions from [wiki:Research/Instrumentation/Meetings/2019/07-10 last meeting]:
    23  * **KL**: Liaise to develop concept for polishing. \\
    24   *
    25  * **KL** send MuScat paper for reference.
    26   * **Done.**
    27  * **KL**: Seek meeting with S.Gruber and/or M.Puchalska to get her input into the design.
    28   * **Done.**
    29  * **LC**: Check re technical effort at RAL for assembly/dowling etc.
    30   * **Done.**
    31  * **LC/JB:** Finalise specification of interface between clear-fibre connector and optical assembly. \\
    32   *
    33  * **JB** Provide ThorLabs part numbers of remaining optical components to AK. \\
    34   * **Done.**
    35  * **KL**: Suggest time for schedule discussion on 30Aug19.
    36   * **Done.**
    37  * **MP**: will check the beam energy spread, perhaps as a function of energy.
    38  * **MP**: will check the definition of the trigger signal.
    39  * **MP**: will make a sketch of the space available for the water phantom, the SmartPhantom, and its electronics.  The couch will be included in the sketch.
    40  * **MP**: will make a sketch ('technical drawing') of the water phantom.
    41  * **HT**: will circulate and post the water phantom specs.
    42  * **LC**: will consider the positioning mechanism.
    43 
     221. Notes and actions from [wiki:Research/Instrumentation/Meetings/2019/08-06 last meeting]:
     23 * **KL**: Liaise to develop concept for polishing.
     24 * **KL**: Define light exclusion scheme for 527.
     25 * **KL**: Inform MP of present design of support mechanism and discuss/identify any issues.
     26 * **AK**: Prepare paperwork necessary to gain permission to work with source in 527.
    4427
    45282. Baseline schedule and progress against schedule: HTL \\
    46  * [raw-attachment:smartphantom.pdf​ Schedule]
    4729
    48 3. Mechanical design update: LC \\
    49  * [raw-attachment:190806-SmartPhantom.ppt​ Slides].
     303. Mechanical design/manufacture update: JT for LC \\
    5031
    51324. Control system and SciWire readout update: AK \\
     
    5637
    57387. DONM \\
    58  * 13Aug19
     39 * 21Aug19
    5940
    60418. AoB \\