| 2 | |
| 3 | == Notes: == |
| 4 | |
| 5 | **Present:** KL, JT, AK, HTL |
| 6 | |
| 7 | 1. Notes and actions from [wiki:Research/Instrumentation/Meetings/2019/09-06 last meeting]: |
| 8 | * **KL**: Liaise to develop concept for polishing. |
| 9 | * **Ongoing.** Keep action to make sure it stays in our minds. |
| 10 | * **KL**: Define light exclusion scheme for 527. |
| 11 | * **Ongoing.** Will use conbination of plastic covers. Need to liaise with occupants of 527 and the offices next door. AK will forward information to KL who will order additional material. |
| 12 | * **KL**: Inform MP of present design of support mechanism and discuss/identify any issues. |
| 13 | * **Done.** AK, HTL, and KL met MP on 13Aug19. The scheme proposed by LC was discussed and accepted in principle. It was //agreed// to propose the following modifications to LC: |
| 14 | * Station 1 (counting from the beam direction) should be mounted independently so that it remains in a fixed, reference location during the exposures. |
| 15 | * Stations 2 to 5 (assuming we use 5) should be mounted separately with a mounting arrangement that allows the required variety of positions to be used. |
| 16 | * The mounting scheme needs also to have some fixing mechanism. |
| 17 | * **AK**: Prepare paperwork necessary to gain permission to work with source in 527. |
| 18 | * **Ongoing.** AK has been liasing with the RPA at Imperial to generate the necessary paper work. Outstanding items include the personnel registration. |
| 19 | |
| 20 | 2. Baseline schedule and progress against schedule: HTL \\ |
| 21 | * [raw-attachment:2019-08-14-SmartPhantom-schedule.pdf Progress against baseline schedule]. |
| 22 | * Points noted: |
| 23 | * LabView: testing of code developed by AK using the stages in 527 did not work. LabView was not able to identify stages. Example executable works OK; so stages are OK. |
| 24 | * Image analysis: essentially complete, at least for present stage of development. |
| 25 | * Confirm with pottoing lab people afternoon. |
| 26 | |
| 27 | 3. Mechanical design/manufacture update: JT for LC \\ |
| 28 | * JT will contact OM to see whether the components have been dispached from the manufacturer. |
| 29 | |
| 30 | 4. Control system and SciWire readout update: AK \\ |
| 31 | * Main LabVIEW interface is being written. Issue is that the first test of communication between the LabVIEW and the stage. |
| 32 | * HighSpec laptop now with AK and installation will begin soon. |
| 33 | * No delivery time on second LapTop. AK will chase. |
| 34 | |
| 35 | 5. Simulation/analysis update: HTL \\ |
| 36 | * [raw-attachment:meeting.pdf Simulation of Epoxy/Mylar for Potting]. |
| 37 | * See slides; points noted: |
| 38 | * Prefered scheme (1mm resin on both sides of station) shows detectors absorb more energy. Scheme with mylar layer is better in that energy lost is smaller. |
| 39 | * Scheme will be discussed Resin Lab people tomorrow. |
| 40 | |
| 41 | 6. Next steps \\ |
| 42 | * Assemble winding jig and prepare winding assembly by the end of next week. |
| 43 | * Define potting scheme so that detailed design can be done when LC is back from holiday. |
| 44 | |
| 45 | 7. DONM \\ |
| 46 | * 21Aug19 |
| 47 | |
| 48 | 8. AoB \\ |
| 49 | * None. |
| 50 | |
| 51 | === Summary of actions: === |
| 52 | * **KL**: Liaise to develop concept for polishing. |
| 53 | * **KL**: Define light exclusion scheme for 527. |
| 54 | * **AK**: Prepare paperwork necessary to gain permission to work with source in 527. |
| 55 | * **AK**: Pass details of second laptop to KL so that delivery can be followed in AK's absense. |
| 56 | |
| 57 | ---- |