wiki:Research/Instrumentation/Meetings/2019/09-13

Version 4 (modified by longkr, 5 years ago) ( diff )

--

SmartPhantom meeting: Wednesday 14th August 2019, 11:00 BST

Meeting details

Blackett 521 (The Tutorial Room) and teleconference

Phone details:

  UK: 08082 380274
  Austria: 0800 006612 

  PIN: 5904750902

Full list of telephone contacts may be found here.


Agenda:

  1. Notes and actions from last meeting:
    • KL: Liaise to develop concept for polishing.
      • Ongoing. Keep action to make sure it stays in our minds.
    • KL: Define light exclusion scheme for 527.
      • Ongoing. Will use conbination of plastic covers. Need to liaise with occupants of 527 and the offices next door.
    • KL: Inform MP of present design of support mechanism and discuss/identify any issues.
    • Done. AK, HTL, and KL met MP on 13Aug19. The scheme proposed by LC was discussed and accepted in principle. It was agreed to propose the following modifications to LC:
      • Station 1 (counting from the beam direction) should be mounted independently so that it remains in a fixed, reference location during the exposures.
      • Stations 2 to 5 (assuming we use 5) should be mounted separately with a mounting arrangement that allows the required variety of positions to be used.
      • The mounting scheme needs also to have some fixing mechanism.
    • AK: Prepare paperwork necessary to gain permission to work with source in 527.
      • Ongoing. AK has been liasing with the RPA at Imperial to generate the necessary paper work.
  1. Baseline schedule and progress against schedule: HTL
  1. Mechanical design/manufacture update: JT for LC
  1. Control system and SciWire readout update: AK
  1. Simulation/analysis update: HTL
  1. Next steps
  1. DONM
    • 21Aug19
  1. AoB

Attachments (2)

Download all attachments as: .zip

Note: See TracWiki for help on using the wiki.