Version 6 (modified by 5 years ago) ( diff ) | ,
---|
SmartPhantom meeting: Wednesday 14th August 2019, 11:00 BST
Meeting details
Blackett 521 (The Tutorial Room) and teleconference
Phone details:
UK: 08082 380274 Austria: 0800 006612 PIN: 5904750902
Full list of telephone contacts may be found here.
Agenda:
- Notes and actions from last meeting:
- KL: Liaise to develop concept for polishing.
- Ongoing. Keep action to make sure it stays in our minds.
- KL: Define light exclusion scheme for 527.
- Ongoing. Will use conbination of plastic covers. Need to liaise with occupants of 527 and the offices next door.
- KL: Inform MP of present design of support mechanism and discuss/identify any issues.
- Done. AK, HTL, and KL met MP on 13Aug19. The scheme proposed by LC was discussed and accepted in principle. It was agreed to propose the following modifications to LC:
- Station 1 (counting from the beam direction) should be mounted independently so that it remains in a fixed, reference location during the exposures.
- Stations 2 to 5 (assuming we use 5) should be mounted separately with a mounting arrangement that allows the required variety of positions to be used.
- The mounting scheme needs also to have some fixing mechanism.
- AK: Prepare paperwork necessary to gain permission to work with source in 527.
- Ongoing. AK has been liasing with the RPA at Imperial to generate the necessary paper work.
- KL: Liaise to develop concept for polishing.
- Baseline schedule and progress against schedule: HTL
- Mechanical design/manufacture update: JT for LC
- Control system and SciWire readout update: AK
- Simulation/analysis update: HTL
- Next steps
- DONM
- 21Aug19
- AoB
Attachments (2)
- 2019-08-14-SmartPhantom-schedule.pdf (25.2 KB ) - added by 5 years ago.
- meeting.pdf (661.3 KB ) - added by 5 years ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.