wiki:Research/Instrumentation/Meetings/2019/09-24

Version 1 (modified by longkr, 5 years ago) (diff)

--

SmartPhantom meeting: Tuesday 24th September 2019, 11:30 BST

Meeting details

Venue: my apologies; I did not book a room at Imperial!

Perhaps JB, AK, and HTL et al can work out a convenient common location.

Phone details:

  UK: 08082 380274
  Austria: 0800 006612 

  PIN: 5904750902

Full list of telephone contacts may be found here.


Agenda:

  1. Notes and actions from last meeting:
    • KL: Liaise to develop concept for polishing.
    • KL: Prepare revision to schedule for the next meeting.
    • KL,AK,HTL: Consult to specify the data recording at MedAustron.
    • AK: Invent a note numbering scheme so that HTL's note can be "published" on the wiki as a CCAP note.
    • HTL: Add CCAP note number to the header of the note and post it as a CCAP note.
    • KL: Email D.Nardini and I.Clark to explain the teh next steps in the programme and to request machining of carbon fibre (two frames, two connector strips).
    • AK: Purchase hard-drive to store SmartPhantom data in operation.
    • KL or HTL: Transport optical components from Imperial to RAL (LC).
    • LC: Complete detailed design of the boot.
    • KL: Send fibre invoices to HTL.
    • HTL: Provide spreadsheet with revised, precise estimate of fibre cost.
    • KL: Prepare a revised costing spreadsheet for next meeting.
  1. Baseline schedule and progress against schedule: KL/HTL
  1. Mechanical design/manufacture update: LC
  1. Control system and SciWire readout update: AK
  1. Optical readout: JB
  1. Simulation/analysis update: HTL
  1. Spend status, discussion of outstanding requirement: KL/All
  1. Next steps: All

  1. DONM
  1. AoB