| Version 1 (modified by , 6 years ago) ( diff ) | 
|---|
SmartPhantom meeting: Tuesday 24th September 2019, 11:30 BST
Meeting details
Venue: my apologies; I did not book a room at Imperial!
Perhaps JB, AK, and HTL et al can work out a convenient common location.
Phone details:
UK: 08082 380274 Austria: 0800 006612 PIN: 5904750902
Full list of telephone contacts may be found here.
Agenda:
- Notes and actions from last meeting:
- KL: Liaise to develop concept for polishing.
- KL: Prepare revision to schedule for the next meeting.
- KL,AK,HTL: Consult to specify the data recording at MedAustron.
- AK: Invent a note numbering scheme so that HTL's note can be "published" on the wiki as a CCAP note.
- HTL: Add CCAP note number to the header of the note and post it as a CCAP note.
- KL: Email D.Nardini and I.Clark to explain the teh next steps in the programme and to request machining of carbon fibre (two frames, two connector strips).
- AK: Purchase hard-drive to store SmartPhantom data in operation.
- KL or HTL: Transport optical components from Imperial to RAL (LC).
- LC: Complete detailed design of the boot.
- KL: Send fibre invoices to HTL.
- HTL: Provide spreadsheet with revised, precise estimate of fibre cost.
- KL: Prepare a revised costing spreadsheet for next meeting.
 
- Baseline schedule and progress against schedule: KL/HTL 
 
- Mechanical design/manufacture update: LC 
 
- Control system and SciWire readout update: AK 
 
- Optical readout: JB 
 
- Simulation/analysis update: HTL 
 
- Spend status, discussion of outstanding requirement: KL/All 
 
- Next steps: All 
 
- DONM 
 
- AoB 
 
  Note:
 See   TracWiki
 for help on using the wiki.
    
