Changes between Version 4 and Version 5 of Research/Instrumentation/Meetings/2019/11-13


Ignore:
Timestamp:
Nov 19, 2019 2:01:53 PM (4 years ago)
Author:
longkr
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/Instrumentation/Meetings/2019/11-13

    v4 v5  
    44 * **KL**: Liaise to develop concept for polishing.
    55 * **LC**: arrange packing of winding jig and inform HTL who will arrange transport.
     6 * **LC**: redraw plane-holder arrangement to meet show flask rotated through 180 decrees about vertical axis.
    67
    78== Notes: ==
     
    2526 * [raw-attachment:square_aperture_boot.jpg Square aperture boot with protrusion intact].
    2627 * [raw-attachment:sample_holder_design.jpg Sample Holder Design].
     28 * We reviewed the drawings but were confused about the geometry of the boot.  Hope was that KL would visit LC during the week to carify.  This proved not to be possible.  Needs to be clarified 20Nov19.
     29 * Following exchange with S.Gruber, understand that cells are grown on surface of flask further from the spout.  LC needs to redraw his support structure for this arrangement.
    2730
    28313. Single-fibre test setup: HTL