SmartPhantom meetings: Wednesday 4th December 2019; 11:00 GMT

Summary of actions:

  • KL: Liaise to develop concept for polishing.
  • KL/LC: Visit C.Lockett and to confirm potting arrangements.
  • KL/LC: Check that drawing pack on the WWW is up to date.

Notes:

  1. Notes and actions from last meeting:
    • KL: Liaise to develop concept for polishing.
      • Stands.
  1. Mechanical design/manufacture update: LC No update this week.
    LC will arrange for KL to visit C.Lockett tomorrow. KL and LC will check that the drawing pack on the wiki is uptodate.
  1. Single-fibre/fibre-bundle test setup: HTL HTL has carried out an extended search for scintillation light excited by the 90Sr source from single fibre. He has not found a signal above background in a scan over the source. Consistent explaination is that light excited by the source is insufficient.
    • AK: suggests to histogram responses from a particular pixel. HTL will pursue using the data that has been recorded.

HTL now prepring a 'pig-tail' of scintillating fibre that can be illuminated by the UV LED, the source and a proton beam at Clatterbridge.

  1. Schedule revision discussion: All
    Agreed to move on to production of pig-tail and winding of clear-fibre light guides.
  1. Spend: outstanding requirement: All
    Outstanding items:
    • Cameras;
    • Cf for the full SmartPhantom. We have enough for the prototype.
    • May also need extra fibre since we've decided to build the pig-tail.
  1. Next steps: All
    As above.

  1. DONM
    Wed. 11Dec19.

  1. AoB
    • We discussed the need to contact MedAustron/MedUniWien re delays. KL will consider and take forward.

Meeting details

Venue: 1105 Blackett Laboratory. Videoconference using the Vidyo system.

Connection details:

Please join the VIDYO meeting by clicking this link: https://vidyoportal.cern.ch/join/SPJlsfAOEV


Agenda:

  1. Notes and actions from last meeting:
    • KL: Liaise to develop concept for polishing.
  1. Mechanical design/manufacture update: LC
  1. Single-fibre/fibre-bundle test setup: HTL
  1. Schedule revision discussion: All
  1. Spend: outstanding requirement: All
  1. Next steps: All

  1. DONM
    Wed. 11Dec19.

  1. AoB