SmartPhantom meetings: Wednesday 4th December 2019; 11:00 GMT
Summary of actions:
- KL: Liaise to develop concept for polishing.
- KL/LC: Visit C.Lockett and to confirm potting arrangements.
- KL/LC: Check that drawing pack on the WWW is up to date.
Notes:
- Notes and actions from last meeting:
- KL: Liaise to develop concept for polishing.
- Stands.
- KL: Liaise to develop concept for polishing.
- Mechanical design/manufacture update: LC
No update this week.
LC will arrange for KL to visit C.Lockett tomorrow. KL and LC will check that the drawing pack on the wiki is uptodate.
- Single-fibre/fibre-bundle test setup: HTL
HTL has carried out an extended search for scintillation light excited by the 90Sr source from single fibre. He has not found a signal above background in a scan over the source. Consistent explaination is that light excited by the source is insufficient.
- AK: suggests to histogram responses from a particular pixel. HTL will pursue using the data that has been recorded.
HTL now prepring a 'pig-tail' of scintillating fibre that can be illuminated by the UV LED, the source and a proton beam at Clatterbridge.
- Schedule revision discussion: All
Agreed to move on to production of pig-tail and winding of clear-fibre light guides.
- Spend: outstanding requirement: All
Outstanding items:- Cameras;
- Cf for the full SmartPhantom. We have enough for the prototype.
- May also need extra fibre since we've decided to build the pig-tail.
- Next steps: All
As above.
- DONM
Wed. 11Dec19.
- AoB
- We discussed the need to contact MedAustron/MedUniWien re delays. KL will consider and take forward.
Meeting details
Venue: 1105 Blackett Laboratory. Videoconference using the Vidyo system.
Connection details:
Please join the VIDYO meeting by clicking this link: https://vidyoportal.cern.ch/join/SPJlsfAOEV
Agenda:
- Notes and actions from last meeting:
- KL: Liaise to develop concept for polishing.
- Mechanical design/manufacture update: LC
- Single-fibre/fibre-bundle test setup: HTL
- Schedule revision discussion: All
- Spend: outstanding requirement: All
- Next steps: All
- DONM
Wed. 11Dec19.
- AoB