SmartPhantom meetings: Wednesday 27th November 2019; 11:00 GMT
Notes:
- Notes and actions from last meeting:
- KL: Liaise to develop concept for polishing.
- Stands.
- KL: Liaise to develop concept for polishing.
- Mechanical design/manufacture update: LC
- Gluing procedure; see:
- https://ccap.hep.ph.ic.ac.uk/trac/attachment/wiki/Research/Instrumentation/Meetings/2019/11-27/SmartPhantom%20Gluing%20Procedure.docx
- https://ccap.hep.ph.ic.ac.uk/trac/attachment/wiki/Research/Instrumentation/Meetings/2019/11-27/image002.jpg https://ccap.hep.ph.ic.ac.uk/trac/attachment/wiki/Research/Instrumentation/Meetings/2019/11-27/image004.jpg
- https://ccap.hep.ph.ic.ac.uk/trac/attachment/wiki/Research/Instrumentation/Meetings/2019/11-27/A2012%20-%20Air%20Products%20-%20Ancamide%20506.pdf
- https://ccap.hep.ph.ic.ac.uk/trac/attachment/wiki/Research/Instrumentation/Meetings/2019/11-27/A7010%20-%20Astor%20Stag%20-%20SER%20300.pdf
- https://ccap.hep.ph.ic.ac.uk/trac/attachment/wiki/Research/Instrumentation/Meetings/2019/11-27/ARALDITE%202011.pdf
- File for printing of boot:
- Design for sample and ionisation-chamber holder. *https://ccap.hep.ph.ic.ac.uk/trac/attachment/wiki/Research/Instrumentation/Meetings/2019/11-27/image001.jpg
- Gluing procedure; see:
We discussed next steps for manufacture and agreed to start with manufacture of connectors, lightguide, and boot assembly.
- Single-fibre test setup: HTL
- See slides.
- Schedule revision discussion: All
Important to address winding of first scintillating-fibre prototypy. Agreed to start with light-guide manufacture.
- Spend: outstanding requirement: All
No update.
- Next steps: All
See above.
- DONM
Wed. 04Dec19.
- AoB
None.
Meeting details
Venue: 1105 Blackett Laboratory. Videoconference using the Vidyo system.
Connection details:
Please join the VIDYO meeting by clicking this link: https://vidyoportal.cern.ch/join/SPJlsfAOEV
Agenda:
- Notes and actions from last meeting:
- KL: Liaise to develop concept for polishing.
- Mechanical design/manufacture update: LC
- Single-fibre test setup: HTL
- Schedule revision discussion: All
Important to address winding of first scintillating-fibre prototypy.
- Spend: outstanding requirement: All
- Next steps: All
- DONM
- AoB
Last modified
5 years ago
Last modified on Dec 4, 2019, 9:27:00 AM
Attachments (9)
-
meeting.pdf
(5.8 MB
) - added by 5 years ago.
Single Fibre Tests Update
- A2012 - Air Products - Ancamide 506.pdf (57.3 KB ) - added by 5 years ago.
- A7010 - Astor Stag - SER 300.pdf (456.4 KB ) - added by 5 years ago.
- ARALDITE 2011.pdf (852.9 KB ) - added by 5 years ago.
- SmartPhantom Gluing Procedure.docx (18.1 KB ) - added by 5 years ago.
- image001.jpg (23.5 KB ) - added by 5 years ago.
- image002.jpg (13.4 KB ) - added by 5 years ago.
- image004.jpg (17.8 KB ) - added by 5 years ago.
- TD-2580-0165.stl (163.9 KB ) - added by 5 years ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.