Version 2 (modified by 19 months ago) ( diff ) | ,
---|
Design and Integration meeting: 02 May 2023 15:00 GMT
Zoom: https://ukri.zoom.us/j/99571436156
Agenda
- Actions from last meeting.
- Simulations.
- AOB
Actions
23-01-24-01 | All to prepare document for the milestone to update the baseline | In progress |
23-04-04-01 | Ajit to create directory structure for simulation files in sharepoint. | In progress |
23-04-25-01 | Ajit to link notes from the joint meeting with WP2 and WP3 to the wiki | Closed |
Notes
Present: Neil Bliss, Clive Hill, Ajit Kurup, Hywel Owen, Rehanah Razak, Will Shields, Colin Whyte
Apologies: Ken Long, Jaroslaw Pasternak
- Actions
- Notes for meeting with WP2 and WP3 on the wiki https://ccap.hep.ph.ic.ac.uk/trac/attachment/wiki/Research/LhARA/DesignAndIntegration/Meetings/2023/2023-04-20/
- Simulations
- No updates, working on the IPAC paper and poster.
- NB: Comments were made in the WPMs meeting.
- Went through WS's poster and discussed comments from the WPMs meeting.
- CH showed updates on the CAD.
- Tape drive is now vertical.
- Target to flange distance has been reduced from 150mm to 100mm.
- Discussion.
- CW will try to schedule another meeting with laser people this week.
Attachments (1)
- 1272-pa1-meng-prs-0005-1.0- Target Chamber 02-05-23.pdf (1.5 MB ) - added by 19 months ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.