Changes between Version 1 and Version 2 of Research/LhARA/DesignAndIntegration/Meetings/2023/2023-07-25


Ignore:
Timestamp:
Aug 1, 2023 11:23:36 AM (9 months ago)
Author:
kurup
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/DesignAndIntegration/Meetings/2023/2023-07-25

    v1 v2  
    99* Preparation for the baseline update.
    1010* AOB
     11
     12== Actions ==
     13|| 23-01-24-01 || '''All''' to prepare document for the milestone to update the baseline || In progress
     14
     15== Notes ==
     16Present:  Clive Hill, Ajit Kurup, Ken Long, Jaroslaw Pasternak, Lilli Platt, Rehanah  Razak,  Colin Whyte, Will Shields\\
     17Apologies: Neil Bliss,  Hywel Owen
     18        * CAD - CH
     19                * CH showed images of the design of the target chamber to allow for moveable mirrors and the camera.
     20                * Layout of the 7 gabor lens capture section adding in vacuum valves.
     21                        * Discussion of the space between Gabor lenses 2 and 3 and the space for the shielding wall.
     22                        * Discussion of the thickness of the radiation shutter and absorption of neutrons.
     23                                * Action: Determine the thickness needed for the radiation shutter.
     24        * Simulations.
     25                * Slides from JP:
     26                        * Search for parameters for the doublet lattice.
     27                        * Found tune per cell to give the same as the old working point.
     28                *  Slides from WS:
     29                        * Using down-sampled SCAPA beam.
     30                        * Spot size optimisation.
     31                        * FFA injection conditions.
     32                        * Meeting with CERN.
     33                        * BDSIM interface to RF-Track and xsuite.