| 11 | |
| 12 | == Actions == |
| 13 | || 23-01-24-01 || '''All''' to prepare document for the milestone to update the baseline || In progress |
| 14 | |
| 15 | == Notes == |
| 16 | Present: Clive Hill, Ajit Kurup, Ken Long, Jaroslaw Pasternak, Lilli Platt, Rehanah Razak, Colin Whyte, Will Shields\\ |
| 17 | Apologies: Neil Bliss, Hywel Owen |
| 18 | * CAD - CH |
| 19 | * CH showed images of the design of the target chamber to allow for moveable mirrors and the camera. |
| 20 | * Layout of the 7 gabor lens capture section adding in vacuum valves. |
| 21 | * Discussion of the space between Gabor lenses 2 and 3 and the space for the shielding wall. |
| 22 | * Discussion of the thickness of the radiation shutter and absorption of neutrons. |
| 23 | * Action: Determine the thickness needed for the radiation shutter. |
| 24 | * Simulations. |
| 25 | * Slides from JP: |
| 26 | * Search for parameters for the doublet lattice. |
| 27 | * Found tune per cell to give the same as the old working point. |
| 28 | * Slides from WS: |
| 29 | * Using down-sampled SCAPA beam. |
| 30 | * Spot size optimisation. |
| 31 | * FFA injection conditions. |
| 32 | * Meeting with CERN. |
| 33 | * BDSIM interface to RF-Track and xsuite. |