Design and Integration meeting: 25 July 2023 15:00 GMT

Zoom: https://ukri.zoom.us/j/99571436156

Agenda

  • Actions from last meeting.
  • Simulations.
  • Preparation for the baseline update.
  • AOB

Actions

23-01-24-01 All to prepare document for the milestone to update the baseline In progress
23-07-25-01 Neil, Clive, Colin Determine the thickness needed for the radiation shutter. Open

Notes

Present: Clive Hill, Ajit Kurup, Ken Long, Jaroslaw Pasternak, Lilli Platt, Rehanah Razak, Colin Whyte, Will Shields
Apologies: Neil Bliss, Hywel Owen

  • CAD - CH
    • CH showed images of the design of the target chamber to allow for moveable mirrors and the camera.
    • Layout of the 7 gabor lens capture section adding in vacuum valves.
      • Discussion of the space between Gabor lenses 2 and 3 and the space for the shielding wall.
      • Discussion of the thickness of the radiation shutter and absorption of neutrons.
        • Action: Determine the thickness needed for the radiation shutter.
  • Simulations.
    • Slides from JP:
      • Search for parameters for the doublet lattice.
      • Found tune per cell to give the same as the old working point.
    • Slides from WS:
      • Using down-sampled SCAPA beam.
      • Spot size optimisation.
      • FFA injection conditions.
      • Meeting with CERN.
      • BDSIM interface to RF-Track and xsuite.