Design and Integration meeting: 25 July 2023 15:00 GMT
Zoom: https://ukri.zoom.us/j/99571436156
Agenda
- Actions from last meeting.
- Simulations.
- Preparation for the baseline update.
- AOB
Actions
23-01-24-01 | All to prepare document for the milestone to update the baseline | In progress |
23-07-25-01 | Neil, Clive, Colin Determine the thickness needed for the radiation shutter. | Open |
Notes
Present: Clive Hill, Ajit Kurup, Ken Long, Jaroslaw Pasternak, Lilli Platt, Rehanah Razak, Colin Whyte, Will Shields
Apologies: Neil Bliss, Hywel Owen
- CAD - CH
- CH showed images of the design of the target chamber to allow for moveable mirrors and the camera.
- Layout of the 7 gabor lens capture section adding in vacuum valves.
- Discussion of the space between Gabor lenses 2 and 3 and the space for the shielding wall.
- Discussion of the thickness of the radiation shutter and absorption of neutrons.
- Action: Determine the thickness needed for the radiation shutter.
- Simulations.
- Slides from JP:
- Search for parameters for the doublet lattice.
- Found tune per cell to give the same as the old working point.
- Slides from WS:
- Using down-sampled SCAPA beam.
- Spot size optimisation.
- FFA injection conditions.
- Meeting with CERN.
- BDSIM interface to RF-Track and xsuite.
- Slides from JP:
Last modified
17 months ago
Last modified on Aug 1, 2023, 11:29:32 AM
Attachments (3)
- WP6meeting25072023_JPasternak.pdf (178.3 KB ) - added by 17 months ago.
- 202307025_WShields.pdf (1.4 MB ) - added by 17 months ago.
- Week 4 Summary Lilli Platt.pdf (5.7 MB ) - added by 17 months ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.