  • Research/LhARA/DesignAndIntegration/Meetings/2023/2023-08-01

    v2 v3  
    99* Preparation for the baseline update.
    1010* AOB
     11
     12== Actions ==
     13|| 23-01-24-01 || '''All''' to prepare document for the milestone to update the baseline || In progress
     14|| 23-07-25-01 || '''Neil, Clive, Colin''' Determine the thickness needed for the radiation shutter. || Open
     15
     16== Notes ==
     17Present:  Neil Bliss,  Clive Hill, Mark Johnson, Ajit Kurup, Ken Long, Jaroslaw Pasternak, Rehanah  Razak,  Colin Whyte\\
     18Apologies: Hywel Owen, Lilli Platt, Will Shields
     19
     20        * Simulations
     21                * Slides from JP
     22                        * Analytic field map with doublet FF focussing.
     23                        * Able to obtain the initial working point.
     24                        * Constant tune as a function of KE.
     25                        * Betatron functions.
     26                        * New parameter list.
     27                        * New lattice allows for large variation of vertical tune.
     28        * CAD
     29                * Details shown by CH on the layout of stage 1.
     30                        * JP: Distance between len 3 and 4 is critical. Distance between lens 2 and 3 can be adjusted.
     31                * Further work on the target chamber shown by CH.
     32                * NB: Progress on FETS FFA engineering details. These details are relevant for LhARA.
     33                        * CH is looking at the vacuum chamber.
     34                        * Need to have strengthening ribs and bellows. 
     35                        * This requirement has led to an increase in the magnet gap size.
     36        * NB: Costing
     37                * Looking at adding detail to the costing detail used in the PA2 proposal.
     38                * Discussion.
     39        * AOB
     40                * JP: question for CH. What is the size of the wall after lens 2 and is there a shutter?
     41                        * Nominally 0.5m
     42                        * Is the gap on the current diagram sufficient?
     43                        * Need to do a radiation study.
     44                        * The size of the wall is important for the injection line.
     45                * RR: Message from WS re submitting an abstract for the NPL workshop.
     46                        * Consensus is if WS can submit one then that is good.
     47