Design and Integration meeting: 15 August 2023 15:00 GMT
Zoom: https://ukri.zoom.us/j/99571436156
Agenda
- Actions from last meeting.
- Simulations.
- Engineering.
- AOB
Actions
23-01-24-01 | All to prepare document for the milestone to update the baseline | In progress |
Notes
Present: Neil Bliss, Clive Hill, Mark Johnson, Ajit Kurup, Keith Middleman, Jaroslaw Pasternak, Lilli Platt, Rehanah Razak, Will Shields, Colin Whyte
Apologies: Ken Long, Hywel Owen
- Keith Middleman senior vacuum design engineer
- Looking at the gas flow through the target vessel interface with the first gabor lens.
- Using MOLFLOW+ (free software for accelerator vacuum modelling ).
- Looked at gas desorption from the target in a diffuse scenario and for different narrower angular spreads.
- CW: Would be good to do an experiment.
- From the simulations it looks like the vacuum should be OK but depends on how strong the beaming affect is.
- Need to also consider gas desorption from the other surfaces of the target vessel.
- KM will prepare a paragraph and the tables for the design review.
- Engineering update - NB
- Meeting tomorrow in Strathclyde to discuss target configurations.
- Further FEA work on the FETS vacuum chamber.
- Looking at trying 8mm wall thickness instead of 10mm by including radii in the corners to reduce stress.
- Power consumption
- Schematic update.
- Need reference design for profile monitor and the cavity to determine if the gap between lenses 2 and 3 is realistic.
- JP to provide cavity dimensions.
- AK to ask FETS for details of profile monitor.
- WS will ask IBA for details of their profile monitors.
- WP5 are charged with beam instrumentation.
- Discussion on position of the collimators.
- One after Gabor lens 3
- One just before the vertical bend
- One half way along the vertical arc.
- Need reference design for profile monitor and the cavity to determine if the gap between lenses 2 and 3 is realistic.
- Slide from CH on the schematic.
- Adjustment of the positions of the Gabor lenses.
- Length between lenses 3 and 4 is critical.
- Simulations
- Slides on end station dose from WS
- File that was found does not have the correct input beam so it looks like the data used in the pre-CDR was lost.
- New BDSIM model
- Uses slightly different physics list.
- 12.2 Gy/shot instead of 12.8 Gy/shot quoted in the pre-CDR.
- Slides from LP on octupole and collimator optimisation.
- Details from JP on FFA design.
- Found working point for high-intensity operation by using a small D (instead of a small F doublet)
- Slides on end station dose from WS
Attachments (3)
- 202308015_WShields.pdf (3.0 MB ) - added by 15 months ago.
- Week 6 Presentation Lilli Platt.pptx (431.8 KB ) - added by 15 months ago.
- 1272-pa1-vac-prs-0001-v1.0-nozzle-gas-trans-prob-2023-08-15.pdf (1.7 MB ) - added by 15 months ago.
Download all attachments as: .zip