| | 10 | |
| | 11 | == Notes == |
| | 12 | * Simulations |
| | 13 | * RF Cavity. |
| | 14 | * CH will try to contact the engineer at RAL for the CAD drawings of the FETS-FFA cavity. |
| | 15 | * JP: Looking at correctors. |
| | 16 | * Magnet - TJK |
| | 17 | * Gap height has been reduced by Shinji. |
| | 18 | * Looking at reducing power requirement. |
| | 19 | * Engineering - CH |
| | 20 | * Slides from Iker on trim coil cooling simulations and design. |
| | 21 | * Update on the layout of the injection line. |
| | 22 | * Next step is to include diagnostics and corrector magnets. |
| | 23 | * AOB |
| | 24 | * Milestone 6 - 28th March 204 |
| | 25 | * KL: Colin wants to know how to break up the work. |
| | 26 | * Diagnostics. |
| | 27 | * JP will write a page or two giving requirements and options for technologies. |
| | 28 | * Controls and feedback. |
| | 29 | * AK can write a spec document. |
| | 30 | |