    v1 v2  
    88* Engineering.
    99* AOB
     10
     11== Notes ==
     12        * Simulations
     13                * RF Cavity.
     14                        * CH will try to contact the engineer at RAL for the CAD drawings of the FETS-FFA cavity.
     15                * JP: Looking at correctors.
     16                * Magnet - TJK
     17                        * Gap height has been reduced by Shinji.
     18                        * Looking at reducing power requirement.
     19        * Engineering - CH
     20                * Slides from Iker on trim coil cooling simulations and design.
     21                * Update on the layout of the injection line.
     22                        * Next step is to include diagnostics and corrector magnets.
     23        * AOB
     24                * Milestone 6 - 28th March 204
     25                        * KL: Colin wants to know how to break up the work.
     26                        * Diagnostics.
     27                                * JP will write a page or two giving requirements and options for technologies.
     28                        * Controls and feedback.
     29                                * AK can write a spec document.
     30