Version 2 (modified by 9 months ago) ( diff ) | ,
---|
Design and Integration meeting: 6 February 2024 15:00 GMT
Zoom: https://ukri.zoom.us/j/99571436156
Agenda
- Simulations.
- Engineering.
- AOB
Actions
Notes
Present: Andy Goulden, Clive Hill, Ta-Jen Kuo, Ajit Kurup, Jaroslaw Pasternak, Matt Pereira, Rehanah Razak, Will Shields, Anna Vikhoreva, Colin Whyte
Apologies: Ken Long, Hywel Owen
- Simulations
- Update from WS:
- stage 1 injection line optimisation with space charge to achieve required injection conditions.
- Gabor lens in BDSIM.
- Physical geometry elements are in place.
- Need to add fields.
- JP: Details from CH on diagnostics and correctors to be added to the optics simulation.
- TJK:
- Power calculation after gap height reduction.
- Currents have not been optimised but have come down by about half.
- Still over the limit.
- AG: About 35% of the power is needed for cooling so total power requirement would be of the order of 4 MW.
- CH: FETS substation is only about 1.25MW
- Longitudinal phase space.
- AK to look into this.
- Update from WS:
- CW: reminder re upcoming milestone and report.
- CH:
- Emailed Bradley Kirk and got CAD model for the FETS FFA RF cavity. Also got some details on beam diagnostics.
- Would like clarification on what level of detail needs to go in the report.
- CW: Deliver the concept and a plan for the FFA but not an engineered solution.
- Discussion on what detail should into the FFA part of the report.
- Agreed to write up what has been done and where the design is now. Focus is on stage 1.
- CH:
- Discussion re what deliverables should go into the bridging funds request.
- Engineering - CH
- Update on coil layout in CAD.
- 10 nested coils with terminations.
- Expectation is that the assembly is potted.
- CW: Plenty of detail already done and it might be useful to talk to a manufacturer at this point to see what they think.
- Update on coil layout in CAD.
Note:
See TracWiki
for help on using the wiki.