    v1 v2  
    88* Engineering.
    99* AOB
     10
     11== Actions ==
     12
     13== Notes ==
     14Present:  Clive Hill, Ta-Jen Kuo, Ajit Kurup,  Jaroslaw Pasternak, Matt Pereira,  Will Shields, Colin Whyte \\
     15Apologies:  Andy Goulden,   Ken Long, Hywel Owen, Rehanah Razak
     16
     17        * Simulations
     18                * Update from WS:
     19                        * GPT being very slow.
     20                        * Got a version of TraceWin
     21                        * Gabor lens field map in BDSim
     22                * Update from JP
     23                        * Update of magnet parameters circulated by email.
     24                        * Discussion
     25                                * requirement on delta_k/k can be relaxed if there's no need for slow extraction.
     26                * Coil configuration and construction - TJK
     27                * Update from MP:
     28                        * Prelim studies on the RF cavity after the nozzle
     29                        * Dipole and quad design in pr.
     30                       
     31                       
     32        * Engineering - CH
     33                * Update to injection line layout.
     34                * Discussion on location of profile monitors.
     35                * CW: Are the stray fields from the correctors an issue?
     36                        * JP: Quads are narrow so it should be OK
     37                * Had a meeting with FETS-FFA and magnet designers re building the magnet
     38                * JP: Magnet was made for the ion beta project at KURNS. Should look up what they did.
     39                * Need details of materials for bulk shielding calculations
     40                        * Discussion re nozzle material.
     41                                * Stainless is probably the favoured choice.
     42                                * AK to ask Chris Densham for guidance on what materials to use.
     43        * AOB
     44                * Discussion on schedule for writing the report for March milestone.
     45                        * Can refer to 12 month report and just provide updates in the milestone report.