- Simulations.
- Engineering.
- AOB
Actions
Notes
Present: Clive Hill, Ta-Jen Kuo, Ajit Kurup, Jaroslaw Pasternak, Matt Pereira, Will Shields, Colin Whyte
Apologies: Andy Goulden, Ken Long, Hywel Owen, Rehanah Razak
- Simulations
- Update from WS:
- GPT being very slow.
- Got a version of TraceWin
- Gabor lens field map in BDSim
- Update from JP
- Update of magnet parameters circulated by email.
- Discussion
- requirement on delta_k/k can be relaxed if there's no need for slow extraction.
- Coil configuration and construction - TJK
- Update from MP:
- Prelim studies on the RF cavity after the end station nozzle
- Dipole and quad design in progress.
- Update from WS:
- Engineering - CH
- Update to injection line layout.
- Discussion on location of profile monitors.
- CW: Are the stray fields from the correctors an issue?
- JP: Quads are narrow so it should be OK
- Had a meeting with FETS-FFA and magnet designers re building the magnet
- JP: Magnet was made for the ion beta project at KURNS. Should look up what they did.
- Need details of materials for bulk shielding calculations
- Discussion re nozzle material.
- Stainless is probably the favoured choice.
- AK to ask Chris Densham for guidance on what materials to use.
- Discussion re nozzle material.
- AOB
- Discussion on schedule for writing the report for March milestone.
- Can refer to 12 month report and just provide updates in the milestone report.
- Discussion on schedule for writing the report for March milestone.