Design and Integration meeting: 20 February 2024 15:00 GMT

Zoom: https://ukri.zoom.us/j/99571436156

Agenda

  • Simulations.
  • Engineering.
  • AOB

Actions

Notes

Present: Clive Hill, Ta-Jen Kuo, Ajit Kurup, Jaroslaw Pasternak, Matt Pereira, Will Shields, Colin Whyte
Apologies: Andy Goulden, Ken Long, Hywel Owen, Rehanah Razak

  • Simulations
    • Update from WS:
      • GPT being very slow.
      • Got a version of TraceWin
      • Gabor lens field map in BDSim
    • Update from JP
      • Update of magnet parameters circulated by email.
      • Discussion
        • requirement on delta_k/k can be relaxed if there's no need for slow extraction.
    • Coil configuration and construction - TJK
    • Update from MP:
      • Prelim studies on the RF cavity after the end station nozzle
      • Dipole and quad design in progress.

  • Engineering - CH
    • Update to injection line layout.
    • Discussion on location of profile monitors.
    • CW: Are the stray fields from the correctors an issue?
      • JP: Quads are narrow so it should be OK
    • Had a meeting with FETS-FFA and magnet designers re building the magnet
    • JP: Magnet was made for the ion beta project at KURNS. Should look up what they did.
    • Need details of materials for bulk shielding calculations
      • Discussion re nozzle material.
        • Stainless is probably the favoured choice.
        • AK to ask Chris Densham for guidance on what materials to use.
  • AOB
    • Discussion on schedule for writing the report for March milestone.
      • Can refer to 12 month report and just provide updates in the milestone report.