Design and Integration meeting: 12 March 2024 15:00 GMT
Zoom: https://ukri.zoom.us/j/99571436156
Agenda
- Simulations.
- Engineering.
- AOB
Actions
Notes
Present: Andy Goulden, Clive Hill, Mark Johnson, Ta-Jen Kuo, Ajit Kurup, Ken Long, Hywel Owen, Will Shields, Colin Whyte
Apologies: Jaroslaw Pasternak, Matt Pereira, Rehanah Razak,
- Simulation
- WS: issue with GPT being investigated
- KL discussed creating a common source input file.
- Based on Maria's mathematical description of the laser driven ion source.
- Slides from Enzo
- Looking at integrated B field
- Simulation with the field clamp.
- Engineering
- CH - Modelling the magnet yoke with the trim coils using details from Enzo.
- First iteration shows some areas where the injection line overlaps with the magnet yokes
- TJK: Should note the magnet spiral should be flipped as the FETS FFA beam goes clockwise whereas LhARA beam goes counter-clockwise.
- CH - Modelling the magnet yoke with the trim coils using details from Enzo.
- Milestone report
- 6 sections at Daresbury
- RF section from Ajit to be added.
- AOB
- WS: slide circulated to add achievements of WP6 to highlight progress. Requires input from others.