Changes between Version 1 and Version 2 of Research/LhARA/DesignAndIntegration/Meetings/2024/2024-03-19


Ignore:
Timestamp:
Mar 26, 2024 11:33:55 AM (5 weeks ago)
Author:
kurup
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/DesignAndIntegration/Meetings/2024/2024-03-19

    v1 v2  
    88* Engineering.
    99* AOB
     10
     11== Actions ==
     12
     13== Notes ==
     14Present:  Clive Hill,  Ajit Kurup,  Ken Long, Matt Pereira, Will Shields, Colin Whyte \\
     15Apologies: Andy Goulden, Mark Johnson, Ta-Jen Kuo, Hywel Owen, Jaroslaw Pasternak,  Rehanah Razak,
     16
     17        * Simulations
     18                * Slides from Ken. WS gave some details.
     19                * WS: where should the code to convert into different formats should be.
     20                * AK: asked about where the input beam file will be stored.
     21               
     22        * Engineering
     23                * CH showed updated schematic with the FFA magnets oriented such that they are consistent with the beam going anti-clockwise.
     24                * Issue with constraints on the injection line and septum details are needed.
     25                * Discussion on dimensions of the cavity and space constraints in the ring.
     26                        * AK to get more detail.
     27        * Discussion on milestone report
     28        * AOB