Version 2 (modified by 8 months ago) ( diff ) | ,
---|
Design and Integration meeting: 19 March 2024 15:00 GMT
Zoom: https://ukri.zoom.us/j/99571436156
Agenda
- Simulations.
- Engineering.
- AOB
Actions
Notes
Present: Clive Hill, Ajit Kurup, Ken Long, Matt Pereira, Will Shields, Colin Whyte
Apologies: Andy Goulden, Mark Johnson, Ta-Jen Kuo, Hywel Owen, Jaroslaw Pasternak, Rehanah Razak,
- Simulations
- Slides from Ken. WS gave some details.
- WS: where should the code to convert into different formats should be.
- AK: asked about where the input beam file will be stored.
- Engineering
- CH showed updated schematic with the FFA magnets oriented such that they are consistent with the beam going anti-clockwise.
- Issue with constraints on the injection line and septum details are needed.
- Discussion on dimensions of the cavity and space constraints in the ring.
- AK to get more detail.
- Discussion on milestone report
- AOB
Attachments (1)
- 2024-03-19-Long.pptx (11.7 MB ) - added by 8 months ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.