    v2 v3  
    88* Simulations.
    99* AOB
     10
     11== Actions ==
     12
     13== Notes ==
     14Present:  Clive Hill,   Ta-Jen Kuo, Ajit Kurup, Ken Long, Jaroslaw Pasternak, Matt Pereira,  Rehanah Razak, Will Shields, Colin Whyte\\
     15Apologies:   Andy Goulden,  Mark Johnson, Hywel Owen,   
     16
     17        * Engineering
     18                * CH showed details of the injection scheme for EMMA.
     19                        * Discussion on whether the circulating beam will interfere with the circulating beam.
     20                        * JP: Kicker can be c-shaped so there won't be a coil in the way of the circulating beam.
     21                * Cavity designs
     22                        * MA cavity will just about fit if it's tilted. Width of cavity is 400mm.
     23                       
     24        * Simulations
     25                * WS: Busy with IPAC preparations
     26                * KL: Plot of trajectories at the end station going through a pair of quads.
     27                        * Idea is to get a 1mm  spot for spot scanning.
     28                        * Discussion.
     29        * AOB
     30                * Discussed moving the weekly WP6 meetings to 4pm.
     31                        * Agreed to keep to 3pm until CH's constraint is finished. Then the meeting time will move to 4pm.