Design and Integration meeting: 25 June 2024 15:00 GMT
Zoom: https://ukri.zoom.us/j/99571436156
Agenda
- Preparation for the final report.
- Engineering.
- Simulations.
- AOB
Actions
Notes
Present: Clive Hill, Ta-Jen Kuo, Ajit Kurup, Hywel Owen, Jaroslaw Pasternak, Matt Pereira, Rehanah Razak, Will Shields, Colin Whyte
Apologies: Andy Goulden, Mark Johnson, Ken Long,
- Final report
- Collab meeting in beginning of Sept. Aim is to have the report ready for then for discussion.
- High-energy line.
- JP: Optics design exists.
- CH: Details of this is needed.
- WS: Working on this and will send details to CH soon.
- JP: Waiting for trackable field map of the FFA and can then finalise the transfer line and injection.
- Engineering - CH
- Slides from last week on the injection line.
- Need details of the kicker
- Sketching the coils of the LhARA magnet in CAD (similar to what was done for the FETS-FFA magnet).
- Showed details from Emi's presentation on diagnostics to see how we could use this for LhARA.
- Potential issue with the length of the BPM and wall current monitor.
- JP: diagnostics will have to be inclined to make them fit.
- Slides from last week on the injection line.
- Simulations
- TJK showed slides on the magnet yoke and clamp optimisation.
- WS: working on injection line.
- AOB
Last modified
6 months ago
Last modified on Jul 2, 2024, 11:30:49 AM
Note:
See TracWiki
for help on using the wiki.