Design and Integration meeting: 25 June 2024 15:00 GMT
Zoom: https://ukri.zoom.us/j/99571436156
Agenda
- Preparation for the final report.
 - Engineering.
 - Simulations.
 - AOB
 
Actions
Notes
Present:    Clive Hill, Ta-Jen Kuo, Ajit Kurup,  Hywel Owen, Jaroslaw Pasternak, Matt Pereira, Rehanah Razak, Will Shields, Colin Whyte 
Apologies:  Andy Goulden, Mark Johnson, Ken Long,    
- Final report
- Collab meeting in beginning of Sept. Aim is to have the report ready for then for discussion.
 - High-energy line.
- JP: Optics design exists.
 - CH: Details of this is needed.
 - WS: Working on this and will send details to CH soon.
 
 - JP: Waiting for trackable field map of the FFA and can then finalise the transfer line and injection.
 
 - Engineering - CH
- Slides from last week on the injection line.
- Need details of the kicker
 
 - Sketching the coils of the LhARA magnet in CAD (similar to what was done for the FETS-FFA magnet).
 - Showed details from Emi's presentation on diagnostics to see how we could use this for LhARA.
- Potential issue with the length of the BPM and wall current monitor.
 - JP: diagnostics will have to be inclined to make them fit.
 
 
 - Slides from last week on the injection line.
 - Simulations
- TJK showed slides on the magnet yoke and clamp optimisation.
 - WS: working on injection line.
 
 - AOB
 
          
            Last modified
 16 months ago          
          
            Last modified on Jul 2, 2024, 11:30:49 AM
          
        
      
  Note:
 See   TracWiki
 for help on using the wiki.
    