Design and Integration meeting: 02 July 2024 15:00 BST

Zoom: https://ukri.zoom.us/j/99571436156

Agenda

  • Preparation for the CDR.
  • Engineering.
  • Simulations.
  • AOB

Actions

Notes

Present: Clive Hill, Ta-Jen Kuo, Ajit Kurup, Ken Long, Jaroslaw Pasternak, Matt Pereira, Rehanah Razak, Will Shields, Colin Whyte
Apologies: Andy Goulden, Mark Johnson, Hywel Owen

  • Engineering
    • Update from CH
      • Schematic has been updated with new yoke design.
      • Need to address collisions with the injection region and where the injection line crosses the FFA beam pipe.
      • Meeting to discuss FFA issues scheduled for 16th July.
      • Discussion on how the yoke geometry can be modified to accommodate the injection septum.
      • Preference is to go with the previous version.
      • Modelling of the trim coils.
        • Detailing of the connections and manifolds.
    • JP: Need to update a drift length in the high energy transfer line design before finalising.
  • Simulations
    • TJK:
      • Produced field map for JP to track.
      • Update on the power requirement 20kW for 1 half of the magnet.
    • WS:
      • Looking at using linear optics code beam.
      • Comparable to the SCAPA beam.
      • Looking the modelling the injection line in GPT.
      • KL: how long does generating the beam?
        • WS: Of the order of half an hour for 1e6 particles.
  • AOB