Version 2 (modified by 4 months ago) ( diff ) | ,
---|
Design and Integration meeting: 30 July 2024 15:00 BST
Zoom: https://ukri.zoom.us/j/99571436156
Agenda
- Engineering.
- Simulations.
- AOB
Actions
Notes
Present: Clive Hill, Ta-Jen Kuo, Ajit Kurup, Jaroslaw Pasternak, Matt Pereira, Rehanah Razak, Will Shields
Apologies: Andy Goulden, Mark Johnson, Ken Long, Hywel Owen, Colin Whyte
- Engineering
- CH went over the slides from the meeting 2 weeks ago. Discussed the questions on Clive's slides.
- JP had meeting with RAL group last week.
- BPM should be no more than 10cm in length.
- Elements (including the RF cavity) can be tilted wrt to the radial direction without any significant effect.
- TJK: New design of the magnet has an increased spiral angle and the field index has decreased. Will have an impact on the space available.
- Discussion re how the design will change and how to present this in the CDR.
- CH showed an FEA simulation of the vacuum chamber and areas of increased deflection.
- Centre of the chamber needs to be strengthened.
- Simulations
- WS: ongoing studies using the beam produced by Ken's code.
Note:
See TracWiki
for help on using the wiki.