| 10 | |
| 11 | == Actions == |
| 12 | |
| 13 | == Notes == |
| 14 | Present: Clive Hill, Ta-Jen Kuo, Ajit Kurup, Ken Long, Hywel Owen, Jaroslaw Pasternak, Matt Pereira, Rehanah Razak, Will Shields, Colin Whyte \\ |
| 15 | Apologies: \\ |
| 16 | |
| 17 | * Engineering |
| 18 | * CH: discussion of the direction of the engineering work. |
| 19 | * JP showed a schematic of new ring design and new injection and extraction scheme with parameters. |
| 20 | * Discussion of the work to be presented in the CDR, plan for future work on the FFA and the option for having a review of the ring design in a few months' time. |
| 21 | * CDR preparation update from WS |
| 22 | * Conversation about the laser parameters have changed. |
| 23 | * Spectrum has now changed and has much a higher cut-off. |
| 24 | * KL: this is work in progress and will require a few more iterations. |
| 25 | * Simulations |
| 26 | * RR: |
| 27 | * Update on the final focus in the end station. |
| 28 | * Thinking of moving the upstream octupole to the end station beam line. |
| 29 | * MP |
| 30 | * Optics update. |
| 31 | * Found the cause of needing to use a SigmaE correction factor of 0.006 is due to an issue with MADX. |
| 32 | * AOB |