Design and Integration meeting: 17 September 2024 16:00 BST
Zoom: https://ukri.zoom.us/j/99571436156
Agenda
- Engineering.
- Simulations.
- AOB
Actions
Notes
Present: Clive Hill, Ta-Jen Kuo, Ajit Kurup, Ken Long, Hywel Owen, Jaroslaw Pasternak, Matt Pereira, Rehanah Razak, Will Shields, Colin Whyte
Apologies:
- Engineering
- CH: discussion of the direction of the engineering work.
- JP showed a schematic of new ring design and new injection and extraction scheme with parameters.
- Discussion of the work to be presented in the CDR, plan for future work on the FFA and the option for having a review of the ring design in a few months' time.
- CDR preparation update from WS
- Conversation about the laser parameters have changed.
- Spectrum has now changed and has much a higher cut-off.
- KL: this is work in progress and will require a few more iterations.
- Conversation about the laser parameters have changed.
- Simulations
- RR:
- Update on the final focus in the end station.
- Thinking of moving the upstream octupole to the end station beam line.
- MP
- Optics update.
- Found the cause of needing to use a SigmaE correction factor of 0.006 is due to an issue with MADX.
- RR:
- AOB
Last modified
3 months ago
Last modified on Sep 24, 2024, 11:24:53 AM
Attachments (1)
- 20240917_WShields.pdf (607.8 KB ) - added by 3 months ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.