Design and Integration meeting: 08 October 2024 16:00 BST

Zoom: https://ukri.zoom.us/j/99571436156

Agenda

  • CDR Status
  • Engineering.
  • Simulations.
  • AOB

Notes

Present: Clive Hill, Will Shields, Colin Whyte, Jaroslaw Pasternak, Hywel Owen, Matt Pereira, Rehanah Razak, Ken Long

Apologies: Ta-Jen Kuo

  • CDR status
    • JP: highlighted missing chapters/content. Missing chapter to wrong .tex file name.
    • JP: Vacuum value discrepancy between FFA & stage 2 beam line, value change to 10-8 in high energy beam line
    • JP: highlighted reference & typo issues.
    • WS: to add layout to intro section of WP6 chapter.
  • Engineering
    • No updates
  • Simulation
    • WS: no update
    • JP: New FFA diagram in CDR
    • JP: Space between magnets for cavities.
      • Discussion on angled cavities - they should introduce behaviour like a cyclotron, transverse oscillations that cancel out turn by turn unless there's a resonance. This should be acceptable.
      • The no. turns are also comparable to cyclotron (~1000 cyc. to 10000 FFA)
    • JP: potential problem still exists in the proximity of the FFA magnets to the MA cavity core.
    • JP: Kickers may still be a concern, they may need making shorter & stronger.
      • Worst case, 2 kickers will be needed instead of 1.
    • Maximum field on ferrite cavity should be kept < 0.05T (from kicker field) - could be challenging.
    • TJK to extend the good field region of the FFA magnet to cover 15 MeV beams in BP1 phase.
    • JP: FFA dynamic aperture study added to CDR.
  • AOB
    • WS to ask Hywel for PMQ geometry
      • 420 T/m field limit