Design and Integration meeting: 08 October 2024 16:00 BST
Zoom: https://ukri.zoom.us/j/99571436156
Agenda
- CDR Status
- Engineering.
- Simulations.
- AOB
Notes
Present: Clive Hill, Will Shields, Colin Whyte, Jaroslaw Pasternak, Hywel Owen, Matt Pereira, Rehanah Razak, Ken Long
Apologies: Ta-Jen Kuo
- CDR status
- JP: highlighted missing chapters/content. Missing chapter to wrong .tex file name.
- JP: Vacuum value discrepancy between FFA & stage 2 beam line, value change to 10-8 in high energy beam line
- JP: highlighted reference & typo issues.
- WS: to add layout to intro section of WP6 chapter.
- Engineering
- No updates
- Simulation
- WS: no update
- JP: New FFA diagram in CDR
- JP: Space between magnets for cavities.
- Discussion on angled cavities - they should introduce behaviour like a cyclotron, transverse oscillations that cancel out turn by turn unless there's a resonance. This should be acceptable.
- The no. turns are also comparable to cyclotron (~1000 cyc. to 10000 FFA)
- JP: potential problem still exists in the proximity of the FFA magnets to the MA cavity core.
- JP: Kickers may still be a concern, they may need making shorter & stronger.
- Worst case, 2 kickers will be needed instead of 1.
- Maximum field on ferrite cavity should be kept < 0.05T (from kicker field) - could be challenging.
- TJK to extend the good field region of the FFA magnet to cover 15 MeV beams in BP1 phase.
- JP: FFA dynamic aperture study added to CDR.
- AOB
- WS to ask Hywel for PMQ geometry
- 420 T/m field limit
- WS to ask Hywel for PMQ geometry
Last modified
6 weeks ago
Last modified on Oct 8, 2024, 9:16:27 PM
Note:
See TracWiki
for help on using the wiki.