    1111== Notes ==
    12 Present: TBC
    13 Absent: TBC
     12Present: HO, JP, CH, RR, WS, TJK, CW, MP
     13Absent:
    1414
    1515* FFA Meeting rescheduling
    16         * TBC
     16        * Discussed availability & suitable dates. 19th & 26th February the best dates, WS to circulate a doodle poll with additional dates.
    1717
    1818* Engineering
    19         * TBC
     19        * No update. WS to send latest spreadsheet with beam line survey,
    2020
    2121* Simulation
    22         * TBC
     22        * MP: working on solenoid field map generation to ensure BDSIM & GPT cross consistency. Issue with BDSIM field agreement with theory.
     23        * WS: off with illness hence FFA review meeting rescheduling.
     24        * TJK: showed images of FETS/ISIS FFA prototype coil windings. Windings manually bent, question on field accuracy posed. Fraction of coils vs surrounding fabric also raised.
     25        * JP: Showed 2D field map of FFA magnet with cavity positioned between magnets. Important to understand field & keep relative permittivity below 1000 otherwise you lose shunt impedance. Conversion of map to Cartesian coords will be rechecked. Dimensions of the cavity presently 38cm thick, 2m wide, 1.2m high.