Changes between Version 1 and Version 2 of Research/LhARA/DesignAndIntegration/Meetings/2025/2025-02-18


Ignore:
Timestamp:
Feb 18, 2025, 9:58:21 PM (5 days ago)
Author:
wshields
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/DesignAndIntegration/Meetings/2025/2025-02-18

    v1 v2  
    99
    1010== Notes ==
    11 Present:
    12 Absent:
     11Present: CH, WS, MP, JP, TJK
     12Absent: HO, KL, CW, RR
    1313
    1414* Engineering
    15         *
     15        * CH re-raised issue with injection line intersecting the FFA magnets. JP agreed to send layout files to CH.
    1616* Simulation
    17         *
     17        * WS: GPT issues. Either reading out or model construction, likely reading. Simulation w/o space charge took ~30 mins, simulations with space charge will be time consuming.
     18        * MP: Still debugging solenoid field maps.
     19        * TJK: see slides.
    1820* AOB