Changes between Version 1 and Version 2 of Research/LhARA/DesignAndIntegration/Meetings/2025/2025-02-18
- Timestamp:
- Feb 18, 2025, 9:58:21 PM (5 days ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/LhARA/DesignAndIntegration/Meetings/2025/2025-02-18
v1 v2 9 9 10 10 == Notes == 11 Present: 12 Absent: 11 Present: CH, WS, MP, JP, TJK 12 Absent: HO, KL, CW, RR 13 13 14 14 * Engineering 15 * 15 * CH re-raised issue with injection line intersecting the FFA magnets. JP agreed to send layout files to CH. 16 16 * Simulation 17 * 17 * WS: GPT issues. Either reading out or model construction, likely reading. Simulation w/o space charge took ~30 mins, simulations with space charge will be time consuming. 18 * MP: Still debugging solenoid field maps. 19 * TJK: see slides. 18 20 * AOB