Design and Integration meeting: 18 February 2025 15:00 BST
Zoom: https://ukri.zoom.us/j/99571436156
Agenda
- Engineering.
- Simulations.
- AOB.
Notes
Present: CH, WS, MP, JP, TJK Absent: HO, KL, CW, RR
- Engineering
- CH re-raised issue with injection line intersecting the FFA magnets. JP agreed to send layout files to CH.
- Simulation
- WS: GPT issues. Either reading out or model construction, likely reading. Simulation w/o space charge took ~30 mins, simulations with space charge will be time consuming.
- MP: Still debugging solenoid field maps.
- TJK: see slides.
- AOB
Last modified
5 days ago
Last modified on Feb 18, 2025, 9:58:21 PM
Note:
See TracWiki
for help on using the wiki.