Changes between Version 1 and Version 2 of Research/LhARA/DesignAndIntegration/Meetings/2025/2025-03-18
- Timestamp:
- Mar 18, 2025, 5:37:57 PM (2 weeks ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/LhARA/DesignAndIntegration/Meetings/2025/2025-03-18
v1 v2 10 10 11 11 == Notes == 12 Present: 13 Absent: 12 Present: WS, KL, MP, CH, TJK, MP 13 Absent: RR, CW, HO 14 14 15 15 * Collaboration Meeting Agenda 16 * WS (20) RR + MP (10) on stage 1 / FFA injection line (30 mins), JP on FFA (20), TJK on FFA magnet (20), CH on engineering (20). 16 17 * Engineering 18 * CH to send Creo CAD to WS (for GERF). TJK to send latest FFA magnet step file to CH). 17 19 * Simulation 20 * WS: No update (writing FFA review document). 21 * MP: quick update on uniformity, using incorrect file, slides to be presented next week. 22 * TJK no sim update, showed photos of FETS FFA magnet prototype + coil windings. 18 23 * AOB 24 * JP: Can move back to 4pm after next week. Re-assess at CM7. 25 * TJK: Available to present at IPAC. WS to add TJK to authors. 19 26 27 28