Changes between Version 1 and Version 2 of Research/LhARA/DesignAndIntegration/Meetings/2025/2025-03-18


Ignore:
Timestamp:
Mar 18, 2025, 5:37:57 PM (2 weeks ago)
Author:
wshields
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/DesignAndIntegration/Meetings/2025/2025-03-18

    v1 v2  
    1010
    1111== Notes ==
    12 Present:
    13 Absent:
     12Present: WS, KL, MP, CH, TJK, MP
     13Absent: RR, CW, HO
    1414
    1515* Collaboration Meeting Agenda
     16        * WS (20) RR + MP (10) on stage 1 / FFA injection line (30 mins), JP on FFA (20), TJK on FFA magnet (20), CH on engineering (20).
    1617* Engineering
     18        * CH to send Creo CAD to WS (for GERF). TJK to send latest FFA magnet step file to CH).
    1719* Simulation
     20        * WS: No update (writing FFA review document).
     21        * MP: quick update on uniformity, using incorrect file, slides to be presented next week.
     22        * TJK no sim update, showed photos of FETS FFA magnet prototype + coil windings.
    1823* AOB
     24        * JP: Can move back to 4pm after next week. Re-assess at CM7.
     25        * TJK: Available to present at IPAC. WS to add TJK to authors.
    1926
     27
     28