Design and Integration meeting: 18 March 2025 15:00 BST
Zoom: https://ukri.zoom.us/j/99571436156
Agenda
- Collaboration Meeting Agenda
- Engineering.
- Simulations.
- AOB.
Notes
Present: WS, KL, MP, CH, TJK, MP Absent: RR, CW, HO
- Collaboration Meeting Agenda
- WS (20) RR + MP (10) on stage 1 / FFA injection line (30 mins), JP on FFA (20), TJK on FFA magnet (20), CH on engineering (20).
- Engineering
- CH to send Creo CAD to WS (for GERF). TJK to send latest FFA magnet step file to CH).
- Simulation
- WS: No update (writing FFA review document).
- MP: quick update on uniformity, using incorrect file, slides to be presented next week.
- TJK no sim update, showed photos of FETS FFA magnet prototype + coil windings.
- AOB
- JP: Can move back to 4pm after next week. Re-assess at CM7.
- TJK: Available to present at IPAC. WS to add TJK to authors.
Last modified
2 weeks ago
Last modified on Mar 18, 2025, 5:37:57 PM
Note:
See TracWiki
for help on using the wiki.