Design and Integration meeting: 20 October 2025 11:00 BST
Zoom: https://ukri.zoom.us/j/99571436156
Agenda
- Simulations.
- AOB.
Notes
Present: WS CW TJK JP MMC MP
Absent: KL HO RR
- Simulations
- MP gave brief update on beam capture simulations with PMQs at 15 MeV. Slides asked for 2 weeks time. Brief discussion followed on transmission at 15 MeV and synergy with PoPLaR simulations by Calvin (CD). WS to discuss with CD at Lates r.e. beam description & profile & spectrum measurements without quads. Opportunity for Robbie to measure without PMQs to understand divergence as function of energy.
- TJK thesis writing.
- JP gave brief update on RF cavity simulations. LhARA can operate with 4 kV total in a single cavity; injected beams will circulate for 80 turns completing 1/4 of a synchrotron oscillation, totalling ~27 us. Then the FFA can switch to the acceleration phase. Currently the CDR says 4 kV across 2 cavities, JP proposes changing to say 4 kV per turn, and let later performance simulations & economics decide if 1 or 2 cavities is more feasible. WS to email Josie to update CDR.
- AOB
- MMC to join us on longitudinal LhARA program. WS & MMC to meet to discuss LhARA models. Meet in a few weeks with JP & David Kelliher to discuss longitudinal modelling.
- MP absent next week.
- WS working on Lates material.
Last modified
15 hours ago
Last modified on Oct 20, 2025, 12:13:20 PM