Changes between Version 1 and Version 2 of Research/LhARA/DesignAndIntegration/Meetings/2025/2025-10-20
- Timestamp:
- Oct 20, 2025, 12:13:20 PM (20 hours ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/LhARA/DesignAndIntegration/Meetings/2025/2025-10-20
v1 v2 8 8 9 9 == Notes == 10 Present: \\11 Absent: \\10 Present: WS CW TJK JP MMC MP\\ 11 Absent: KL HO RR \\ 12 12 13 13 * Simulations 14 * 14 * MP gave brief update on beam capture simulations with PMQs at 15 MeV. Slides asked for 2 weeks time. Brief discussion followed on transmission at 15 MeV and synergy with PoPLaR simulations by Calvin (CD). WS to discuss with CD at Lates r.e. beam description & profile & spectrum measurements without quads. Opportunity for Robbie to measure without PMQs to understand divergence as function of energy. 15 * TJK thesis writing. 16 * JP gave brief update on RF cavity simulations. LhARA can operate with 4 kV total in a single cavity; injected beams will circulate for 80 turns completing 1/4 of a synchrotron oscillation, totalling ~27 us. Then the FFA can switch to the acceleration phase. Currently the CDR says 4 kV across 2 cavities, JP proposes changing to say 4 kV per turn, and let later performance simulations & economics decide if 1 or 2 cavities is more feasible. WS to email Josie to update CDR. 15 17 * AOB 18 * MMC to join us on longitudinal LhARA program. WS & MMC to meet to discuss LhARA models. Meet in a few weeks with JP & David Kelliher to discuss longitudinal modelling. 19 * MP absent next week. 20 * WS working on Lates material. 21