Changes between Version 1 and Version 2 of Research/LhARA/DesignAndIntegration/Meetings/2025/2025-10-20


Ignore:
Timestamp:
Oct 20, 2025, 12:13:20 PM (20 hours ago)
Author:
wshields
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/DesignAndIntegration/Meetings/2025/2025-10-20

    v1 v2  
    88
    99== Notes ==
    10 Present: \\
    11 Absent:  \\
     10Present: WS CW TJK JP MMC MP\\
     11Absent:  KL HO RR \\
    1212
    1313* Simulations
    14         *
     14        * MP gave brief update on beam capture simulations with PMQs at 15 MeV. Slides asked for 2 weeks time. Brief discussion followed on transmission at 15 MeV and synergy with PoPLaR simulations by Calvin (CD). WS to discuss with CD at Lates r.e. beam description & profile & spectrum measurements without quads. Opportunity for Robbie to measure without PMQs to understand divergence as function of energy.   
     15        * TJK thesis writing.
     16        * JP gave brief update on RF cavity simulations. LhARA can operate with 4 kV total in a single cavity; injected beams will circulate for 80 turns completing 1/4 of a synchrotron oscillation, totalling ~27 us. Then the FFA can switch to the acceleration phase. Currently the CDR says 4 kV across 2 cavities, JP proposes changing to say 4 kV per turn, and let later performance simulations & economics decide if 1 or 2 cavities is more feasible. WS to email Josie to update CDR.
    1517* AOB
     18        * MMC to join us on longitudinal LhARA program. WS & MMC to meet to discuss LhARA models. Meet in a few weeks with JP & David Kelliher to discuss longitudinal modelling.
     19        * MP absent next week.
     20        * WS working on Lates material.
     21