  • Research/LhARA/IonAcoustic/Meetings/2023/10-05

    v8 v9  
    2222----
    2323== Notes ==
     24
     251.  A long elongated tube will cause the (unwanted) dispersion of the beam: we might need to re-design the phantom
     26
     272. In the experiment we should keep in mind that we might get a 12-14 MeV beam, to 20 MeV
     28
     293. Shall we plan an experiment where we have the SciFi stations in front of the phantom and not inside?
     30
     314. Electron noise should be investigated further - very interesting results
     32
     335. The matrix and linear arrays are in the frequency range of detectable signals
     34
     356. Coupling them on the side of the phantom might cause poor reconstruction. The gel cannot couple all interfaces (water-kapton-air)
     36
     377. Pre-amplification: can we borrow one from the company in Munich?
     38
     398. Liquid scintillator sounds promising
     40
     419. Experiment most likely to be done over the summer with Julie/Sonja's help
     42