Changes between Version 3 and Version 4 of Research/LhARA/IonAcoustic/Meetings/2023/10-19
- Timestamp:
- Oct 19, 2023, 6:00:14 PM (13 months ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/LhARA/IonAcoustic/Meetings/2023/10-19
v3 v4 14 14 == Notes == 15 15 16 1. 16 1. k-Wave C++ error: run examples and double check with Billy, send code to Ben to run it himself 17 18 2. The correct linear array should be simulated (Probe - 9L-D) 19 20 3. FRPT'23 conference presentation: use the LhARA BDSIM simulation (not LION) 21 22 4. Water-kapton-gel interface experiment: design a plastic/perspex fish tank with a brown kapton entry window - talk to Oliver tomorrow. The experiment is most likely to take place in November at ICR. 23 24 25