Changes between Version 1 and Version 2 of Research/LhARA/IonAcoustic/Meetings/2024/04-16
- Timestamp:
- Apr 15, 2024, 12:30:25 PM (7 months ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/LhARA/IonAcoustic/Meetings/2024/04-16
v1 v2 5 5 == Agenda == 6 6 7 1. Simulation update: MM7 1. Introduction: KL 8 8 9 2. S cintillating fibre detectors status: MM9 2. Simulation update: MM 10 10 11 3. Kapton transmission measurement experiment: MM J JB11 3. Scintillating fibre detectors status: MM 12 12 13 4. Liquid scintillator update: PH13 4. Kapton transmission measurement experiment: MM J JB 14 14 15 5. Piston hydrophone: JB & BC15 5. Liquid scintillator update: PH 16 16 17 6. P roject timeline: **All**17 6. Piston hydrophone: JB & BC 18 18 19 7. //AOB//: **All** 19 7. Project timeline: **All** 20 21 8. //AOB//: **All** 20 22 21 23 ----