Version 9 (modified by 10 months ago) ( diff ) | ,
---|
LhARA Project WPM Meeting 6th February 2024 14:00 GMT =
Meeting URL: https://strath.zoom.us/j/84550543598?from=addon
Meeting ID: 845 5054 3598 Password: 737274
Agenda
Bridging funds
K Long - discussion - slides (here)
Bridging funds - discussion
Deliverables Work Package 1. Project management: Deliverables
- D1 Early progress review CDR M6
- D2 Interim progress review CDR M12
- D3 Pre-CDR Review M18
- D4 CDR M24
- D5 Initial progress review TDR & technical de-risk update M30
- D6 Interim progress review TDR & technical de-risk update M36
- D7 Final progress review TDR & technical de-risk update M42
- D8 Stage 1 TDR & technical de-risk report M48
- D9 Pre-TDR2 review M54
- D10 TDR2 M60
Milestones
Work package 2: Laser-driven proton and ion source
- M2.1: Prediction of optimised proton source parameters for 100+ TW laser systems based on hydrodynamic and kinetic simulations M12
- M2.2: First SCAPA ion source simulations and experiment completed M18
- M2.3: Investigation and demonstration of 10 Hz debris and damage challenges at ICL M36
- M2.4: Demonstration of continuous operation of 1 Hz beam generation on SCAPA M48
- M2.5: Demonstration of stabilised 5 Hz beam generation on SCAPA M60
Work package 3: Proton and ion capture
- M3.1: Validate plasma simulations with existing Swansea experimental set-up M6
- M3.2: Progress report of large diameter plasma experiments and simulations M18
- M3.3: Next generation plasma lens testbench design M24
- M3.4: Progress report of standalone plasma apparatus build and commissioning M36
- M3.5: Progress report of large particle-number plasma experiments and simulations M48
- M3.6: Ion focussing results M60
- M3.7: Final plasma lens design M60
Radiobiological Science and technology
Work Package 7:
- M7.1: Develop beamline and bespoke facilities at SCAPA for radiobiology experimentation M30
- M7.2: Preliminary results from cell survival/DNA damage experiments with laser-accelerated protons at SCAPA M36
- M7.3: Development of RBEs of laser-accelerated protons (versus pre-existing cyclotron-driven protons) in established cell lines M48
- M7.4: Assessment of DNA damage repair kinetics and immunopeptidomic analysis of laser-accelerated protons M48
Work package 4: Ion-acoustic dose mapping
- M4.1: Geant4 simulations of beam energy deposition profile M18
- M4.2: Acoustic sensor array design M24
- M4.3: Iterative reconstruction methods M42
- M4.4: Integration: ultra-sonic array with radiobiology station M48 may require manpower up-lift and some equipment funds
- M4.5: LhARA ion-acoustic test results M48
Work package 5: Novel end-station development
- M5.1: Design LhARA automated cell dish handling and environmental system M24
- M5.2: Report on end-station user-community consultation M24
- M5.3: Report on end-station component testing at Birmingham M24
- M5.4: Construct beam delivery room including end-station and cellular imaging capabilities M60
- M5.5: Specification of LhARA beam monitoring technology M24
- M5.6: Report on delivery of LhARA beam monitoring system M60
- M5.7: kGy/s tests at Birmingham M24
Work package 6: Design and integration
- M6.1: Final review of R&D work towards LhARA CDR M18
- M6.2: Final review of R&D work towards LhARA Phase 1 TDR M35/M42
- M6.3: Final? review of R&D work towards LhARA Phase 2 TDR M54/M48?
- M6.4: Technical report on FFA main magnet prototype M58.
- M6.5: Technical report on MA RF cavity prototype M58.
Work Package 8:
- Creation of collaborative international clinical research group M40
- Wider public engagement - All party parliamentary group on radiotherapy M48
PA1
Achievements
- humble bragg competition?
WP5 consultation 3, Jan 24th Liverpool. Excellent meeting
https://indico.stfc.ac.uk/event/923/?print=1
AOB
Attachments (1)
- 01-2024-02-06-Long.pptx (987.0 KB ) - added by 10 months ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.