  • Research/LhARA/ProjectBoard/Meetings/2024/02-20

    v2 v3  
    1111== Bridging funds
    1212
    13 === K Long - discussion - slides ([raw-attachment:01-2024-02-20-Long.pptx here])
     13=== K Long - discussion - slides ([raw-attachment:01-2024-02-20-Long1.pptx here])
    1414
    15 Bridging funds - discussion
     15Bridging funds - discussion.
     16
     17
    1618
    1719Deliverables
     
    3234Work package 3: Proton and ion capture
    3335
    34 
    3536• ''' M3.3: Progress report on increased voltage penning trap simulations and operation. M36 '''
    3637• ''' M3.4: Final report high voltage penning trap operation. M48 '''
    3738
    38 
    3939=== Radiobiological Science and technology
    4040
    41    Work Package 7:
     41Work Package 7:
    4242
    4343 • ''' M7.1: Develop beamline and bespoke facilities at SCAPA for radiobiology experimentation M30 '''
     
    4646 • ''' M7.4: Assessment of DNA damage repair kinetics and immunopeptidomic analysis of laser-accelerated protons M48 '''
    4747
    48    Work package 4: Ion-acoustic dose mapping
     48Work package 4: Ion-acoustic dose mapping
    4949
    5050 • ''' M4.3: Iterative reconstruction methods M42 '''
     
    5252 • ''' M4.5: LhARA ion-acoustic test results M48 '''
    5353
    54  Work package 5: Novel end-station development
     54Work package 5: Novel end-station development
    5555
    5656 • ''' M5.4: Construct transportable beam delivery end-station M42. '''
     
    7474- humble bragg competition?
    7575
    76 === WP5 consultation 3, Jan 24th Liverpool.  Excellent meeting
    77 
    78 https://indico.stfc.ac.uk/event/923/?print=1
    79 
    80 
    8176== AOB