Changes between Version 5 and Version 6 of Research/LhARA/ProjectBoard/Meetings/2024/02-20
- Timestamp:
- Feb 20, 2024, 1:14:15 PM (9 months ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/LhARA/ProjectBoard/Meetings/2024/02-20
v5 v6 26 26 Work Package 7: 27 27 28 • ''' M7.1: Develop beamline and bespoke facilities at SCAPA for radiobiology experimentation M30 '''29 • ''' M7.2: Preliminary results from cell survival/DNA damage experiments with laser-accelerated protons at SCAPA M36 '''30 • ''' M7.3: Development of RBEs of laser-accelerated protons (versus pre-existing cyclotron-driven protons) in established cell lines M48 '''31 • ''' M7.4: Assessment of DNA damage repair kinetics and immunopeptidomic analysis of laser-accelerated protons M48 '''28 • M7.1: Develop beamline and bespoke facilities at SCAPA for radiobiology experimentation M30 29 • M7.2: Preliminary results from cell survival/DNA damage experiments with laser-accelerated protons at SCAPA M36 30 • M7.3: Development of RBEs of laser-accelerated protons (versus pre-existing cyclotron-driven protons) in established cell lines M48 31 • M7.4: Assessment of DNA damage repair kinetics and immunopeptidomic analysis of laser-accelerated protons M48 32 32 33 33 Work package 4: Ion-acoustic dose mapping 34 34 35 • ''' M4.3: Iterative reconstruction methods M42 '''36 • '''M4.4: Integration: ultra-sonic array with radiobiology station M48 ''' may require manpower up-lift and some equipment funds37 • ''' M4.5: LhARA ion-acoustic test results M48 '''35 • M4.3: Iterative reconstruction methods M42 36 • M4.4: Integration: ultra-sonic array with radiobiology station M48 ''' may require manpower up-lift and some equipment funds 37 • M4.5: LhARA ion-acoustic test results M48 38 38 39 39 Work package 5: Novel end-station development 40 40 41 • ''' M5.4: Construct transportable beam delivery end-station M42. '''42 • ''' M5.6: Report on LhARA stage 1 beam monitoring system M48. '''41 • M5.4: Construct transportable beam delivery end-station M42. 42 • M5.6: Report on LhARA stage 1 beam monitoring system M48. 43 43 44 44 Plus numerical studies to interpret ans evaluate experimental programme - Student led. … … 50 50 Work package 2: Laser-driven proton and ion source 51 51 52 • ''' M2.3: Investigation and demonstration of 10 Hz debris and damage challenges at ICL M36 '''53 • ''' M2.4: Demonstration of continuous operation of 1 Hz beam generation on SCAPA M48 '''52 • M2.3: Investigation and demonstration of 10 Hz debris and damage challenges at ICL M36 53 • M2.4: Demonstration of continuous operation of 1 Hz beam generation on SCAPA M48 54 54 55 55 Work package 3: Proton and ion capture 56 56 57 • ''' M3.3: Progress report on increased voltage penning trap simulations and operation. M36 '''58 • ''' M3.4: Final report high voltage penning trap operation. M48 '''57 • M3.3: Progress report on increased voltage penning trap simulations and operation. M36 58 • M3.4: Final report high voltage penning trap operation. M48 59 59 60 60 61 61 Work package 0 & 6: Design and integration 62 62 63 • ''' M6.2: Final review of R&D work towards LhARA Phase 1 TDR M42 '''63 • M6.2: Final review of R&D work towards LhARA Phase 1 TDR M42 64 64 65 65 Stage 2 CDR 66 • ''' M6.3: Review of R&D work towards LhARA Phase 2 CDR M48 '''66 • M6.3: Review of R&D work towards LhARA Phase 2 CDR M48 67 67 68 68 … … 71 71 Work Package 0 & 1. Project management: Deliverables plus internationalisation 72 72 73 • ''' D5 Initial progress review TDR & technical de-risk update M30 '''74 • ''' D6 Interim progress review TDR & technical de-risk update M36 '''75 • ''' D7 Final progress review TDR & technical de-risk update M42 '''76 • ''' D8 Stage 1 TDR & technical de-risk report M48 '''73 • D5 Initial progress review TDR & technical de-risk update M30 74 • D6 Interim progress review TDR & technical de-risk update M36 75 • D7 Final progress review TDR & technical de-risk update M42 76 • D8 Stage 1 TDR & technical de-risk report M48 77 77 78 78 Work Package 8: 79 79 80 • ''' Creation of collaborative international clinical research group M40 '''81 • ''' Wider public engagement - All party parliamentary group on radiotherapy M48 '''80 • Creation of collaborative international clinical research group M40 81 • Wider public engagement - All party parliamentary group on radiotherapy M48 82 82 83 83 == PA1