Changes between Version 5 and Version 6 of Research/LhARA/ProjectBoard/Meetings/2024/02-20


Ignore:
Timestamp:
Feb 20, 2024 1:14:15 PM (2 months ago)
Author:
cwhyte1
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/ProjectBoard/Meetings/2024/02-20

    v5 v6  
    2626Work Package 7:
    2727
    28  • ''' M7.1: Develop beamline and bespoke facilities at SCAPA for radiobiology experimentation M30 '''
    29  • ''' M7.2: Preliminary results from cell survival/DNA damage experiments with laser-accelerated protons at SCAPA M36 '''
    30  • ''' M7.3: Development of RBEs of laser-accelerated protons (versus pre-existing cyclotron-driven protons) in established cell lines M48 '''
    31  • ''' M7.4: Assessment of DNA damage repair kinetics and immunopeptidomic analysis of laser-accelerated protons M48 '''
     28 •  M7.1: Develop beamline and bespoke facilities at SCAPA for radiobiology experimentation M30
     29 •  M7.2: Preliminary results from cell survival/DNA damage experiments with laser-accelerated protons at SCAPA M36
     30 •  M7.3: Development of RBEs of laser-accelerated protons (versus pre-existing cyclotron-driven protons) in established cell lines M48
     31 •  M7.4: Assessment of DNA damage repair kinetics and immunopeptidomic analysis of laser-accelerated protons M48
    3232
    3333Work package 4: Ion-acoustic dose mapping
    3434
    35  • ''' M4.3: Iterative reconstruction methods M42 '''
    36  • ''' M4.4: Integration: ultra-sonic array with radiobiology station M48 ''' may require manpower up-lift and some equipment funds
    37  • ''' M4.5: LhARA ion-acoustic test results M48 '''
     35 •  M4.3: Iterative reconstruction methods M42
     36 • M4.4: Integration: ultra-sonic array with radiobiology station M48 ''' may require manpower up-lift and some equipment funds
     37 •  M4.5: LhARA ion-acoustic test results M48
    3838
    3939Work package 5: Novel end-station development
    4040
    41  • ''' M5.4: Construct transportable beam delivery end-station M42. '''
    42  • ''' M5.6: Report on LhARA stage 1 beam monitoring system M48. '''
     41 •  M5.4: Construct transportable beam delivery end-station M42.
     42 •  M5.6: Report on LhARA stage 1 beam monitoring system M48.
    4343
    4444Plus numerical studies to interpret ans evaluate experimental programme - Student led.
     
    5050Work package 2: Laser-driven proton and ion source
    5151
    52 ''' M2.3: Investigation and demonstration of 10 Hz debris and damage challenges at ICL M36 '''
    53 ''' M2.4: Demonstration of continuous operation of 1 Hz beam generation on SCAPA M48 '''
     52 M2.3: Investigation and demonstration of 10 Hz debris and damage challenges at ICL M36
     53 M2.4: Demonstration of continuous operation of 1 Hz beam generation on SCAPA M48
    5454
    5555Work package 3: Proton and ion capture
    5656
    57 ''' M3.3: Progress report on increased voltage penning trap simulations and operation. M36 '''
    58 ''' M3.4: Final report high voltage penning trap operation. M48 '''
     57 M3.3: Progress report on increased voltage penning trap simulations and operation. M36
     58 M3.4: Final report high voltage penning trap operation. M48
    5959
    6060
    6161Work package 0 & 6: Design and integration
    6262
    63 ''' M6.2: Final review of R&D work towards LhARA Phase 1 TDR M42 '''
     63 M6.2: Final review of R&D work towards LhARA Phase 1 TDR M42
    6464
    6565Stage 2 CDR 
    66 ''' M6.3: Review of R&D work towards LhARA Phase 2 CDR M48 '''
     66 M6.3: Review of R&D work towards LhARA Phase 2 CDR M48
    6767
    6868
     
    7171Work Package 0 & 1. Project management: Deliverables plus internationalisation
    7272
    73 ''' D5 Initial progress review TDR & technical de-risk update M30 '''
    74 ''' D6 Interim progress review TDR & technical de-risk update M36 '''
    75 ''' D7 Final progress review TDR & technical de-risk update M42 '''
    76 ''' D8 Stage 1 TDR & technical de-risk report M48 '''
     73 D5 Initial progress review TDR & technical de-risk update M30
     74 D6 Interim progress review TDR & technical de-risk update M36
     75 D7 Final progress review TDR & technical de-risk update M42
     76 D8 Stage 1 TDR & technical de-risk report M48
    7777
    7878Work Package 8:
    7979
    80 ''' Creation of collaborative international clinical research group M40 '''
    81 ''' Wider public engagement - All party parliamentary group on radiotherapy M48 '''
     80 Creation of collaborative international clinical research group M40
     81 Wider public engagement - All party parliamentary group on radiotherapy M48
    8282
    8383== PA1