Changes between Version 3 and Version 4 of Research/LhARA/RadiationBiology/Meeetings/2025-08-21


Ignore:
Timestamp:
Aug 21, 2025, 4:16:08 PM (3 weeks ago)
Author:
ccd24
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/RadiationBiology/Meeetings/2025-08-21

    v3 v4  
    1 = LhARA radiobiology; meeting: 7Aug25; 14:00 BST =
     1= LhARA radiobiology; meeting: 21Aug25; 14:00 BST =
    22
    33**ZOOM:** https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1
     
    66
    771. Minutes and actions:
     8- **JP**: Consumables plan
     9 - **Stands**
    810
    9112. Strathclyde Phase 1: CD, ED \\
     
    1820
    19214. Beam Diagnostics KL/CD: \\
    20  - KL outlined an idea for a spare SciFi. General agreement that a constant in-beam diagnostic would be useful.
     22 - KL outlined an idea for a sparse SciFi. General agreement that a constant in-beam diagnostic would be useful.
    2123  - KL to work towards a prototype for testing along with Chris Armstrong from RAL. RAL could loan a camera for this testing (with a desire to use a beam diagnostic like this for themselves).
    2224  - Peter Hobson agreed to support the camera work and focussing.
     
    41436. AoB
    4244
    43 Actions
     45=== Summary of actions ===
     46 - **CD**: Upload Technical Summary
     47 - **KL/CD**: Update angular divergence in LLO
     48 - **DA**: Investigate increasing Mylar window thickness
     49 - **KL**: Design SciFi prototype
     50 - **CD**: Design RCF holder
     51 - **CW**: Check service and testing of hoods.
     52 - **EM**: Prepare for dry run
    4453
    4554----