Changes between Initial Version and Version 1 of Research/LhARA/RadiationBiology/Meetings/2024-10-17


Ignore:
Timestamp:
Oct 30, 2024, 12:09:47 PM (3 weeks ago)
Author:
jmm119
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/RadiationBiology/Meetings/2024-10-17

    v1 v1  
     1= LhARA PoPLaR meeting: 17Oct2024; 14:00 BST=
     2
     3**ZOOM:** https://imperial-ac-uk.zoom.us/j/92877706542?pwd=SVRnWUpYRDdOZVY2ZnBmM3grSnFpZz09
     4
     5== Agenda ==
     6
     71. Hardware discussion:\\
     8
     9Quad stages:
     10Supplier has been reached out to for a quote for 2 xyz motorised stages for the quadrupoles.
     11
     12Design (R.G):
     13Demonstrates viewing window, manual insertion state for scintillator to monitor beam profile close to focus.
     14Discussion of RCF- to use instead of Thompson parabola at plane of cells, Thompson used to set up beam.
     15Kapton window before cells.
     16
     172. Bio updates:\\
     18
     19Carousel design finished. Conveyer belt like system, 10 cell plates at a time maximum as vertical suspension with little media results in cells drying. Suggestion to add RCF as one of samples- discussion of scintillator being used, both unlikely to be needed.
     20
     21Discussion of copper activation for instrumentation- activate stack of copper in proton beam where cells would be, count gamma & measure half life.
     22
     233. Beam simulations:\\
     24
     25Decision was made to search for alternative quad positioning within 1.3m as to not interfere with Thompsons parabola positioning- good signal at current position. Decision was also made to look for a 2 quadrupole set up rather than 4 to save time/ money on initial experiments.
     26
     274. AOB:\\
     28
     29Discussion of meeting/half day for updates on all sides of PoPLaR. Poll sent out.
     30
     31