| | 1 | = LhARA PoPLaR meeting: 17Oct2024; 14:00 BST= |
| | 2 | |
| | 3 | **ZOOM:** https://imperial-ac-uk.zoom.us/j/92877706542?pwd=SVRnWUpYRDdOZVY2ZnBmM3grSnFpZz09 |
| | 4 | |
| | 5 | == Agenda == |
| | 6 | |
| | 7 | 1. Hardware discussion:\\ |
| | 8 | |
| | 9 | Quad stages: |
| | 10 | Supplier has been reached out to for a quote for 2 xyz motorised stages for the quadrupoles. |
| | 11 | |
| | 12 | Design (R.G): |
| | 13 | Demonstrates viewing window, manual insertion state for scintillator to monitor beam profile close to focus. |
| | 14 | Discussion of RCF- to use instead of Thompson parabola at plane of cells, Thompson used to set up beam. |
| | 15 | Kapton window before cells. |
| | 16 | |
| | 17 | 2. Bio updates:\\ |
| | 18 | |
| | 19 | Carousel design finished. Conveyer belt like system, 10 cell plates at a time maximum as vertical suspension with little media results in cells drying. Suggestion to add RCF as one of samples- discussion of scintillator being used, both unlikely to be needed. |
| | 20 | |
| | 21 | Discussion of copper activation for instrumentation- activate stack of copper in proton beam where cells would be, count gamma & measure half life. |
| | 22 | |
| | 23 | 3. Beam simulations:\\ |
| | 24 | |
| | 25 | Decision was made to search for alternative quad positioning within 1.3m as to not interfere with Thompsons parabola positioning- good signal at current position. Decision was also made to look for a 2 quadrupole set up rather than 4 to save time/ money on initial experiments. |
| | 26 | |
| | 27 | 4. AOB:\\ |
| | 28 | |
| | 29 | Discussion of meeting/half day for updates on all sides of PoPLaR. Poll sent out. |
| | 30 | |
| | 31 | |